默认 concrete column detailing

concrete column detailing
here is an issue which probably very basic and simple, yet has engineers in my office perplexed.
aci 318, section 7.10.5.4 requires that ties in concrete columns be provided "not more than one-half a tie spacing below the lowest horizontal reinforcement in slab or drop panel above." section 7.10.5.5 states that when beams frame into a column on 4 sides, the ties may be stopped 3" below the lowest horizontal reinforcement in the shallowest of the beams. my interpretation of these requirements is as follows:
if i have a 12" slab supported by 24" wide by 36" deep (incl slab thickness) beams framing into a 24" square column on 3 sides, the ties in the column will need to extend up into the beam, to 1/2 a tie spacing below the bottom reinf in the slab. this would be the case irrespective of the seismic requirements for this column, but in my situation, there is no need for seismic considerations (i.e., column is not part of seismic-load-resisting frame).
is this a correct interpretation? i have never seen a column detailed in such a manner - usually the ties are stopped below the beam, regardless of the number of beams framing into the column. it seems that to run the ties up into the joint between the beams and column would result in so much reinforcing that it would be difficult to place all the reinf, let alone cast the concrete. however, it seems that the requirements of section 7.10.5.4 apply to all columns.
i would appreciate any comments on this code requirement.
thank you,
tony
check out our whitepaper library.
in my assessment your interpretation for this case is correct. further to this point, see notes on aci 318-99 which depicts your situation.
the behavior or performance you are after is to confine the core of the column and when the horizontal beams are not present on one or more sides this is accomplished with the ties.
in your case, this may be more problematic than the benefit derived but it is good detailing based on lessons learned. in my experience, it takes a good rodbender foreman to figure out how to place that reinforcing but it can be done. and it is prudent to have inspectors make sure that it is done a detailed.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
concrete beam to column connection huangyhg 产品功能分析 0 2009-09-08 11:43 AM
concrete beam connection to steel column huangyhg 产品功能分析 0 2009-09-08 11:40 AM
chapter 4 preliminary design properties of concrete huangyhg 产品功能分析 0 2009-09-07 11:23 PM
cantilever steel beam at column huangyhg 产品功能分析 0 2009-09-07 10:40 PM
another aci slender column question huangyhg 产品功能分析 0 2009-09-07 12:13 PM


所有的时间均为北京时间。 现在的时间是 07:05 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多