默认 concrete beam connection to steel column

concrete beam connection to steel column
i have a slab that is being repoured and in one section i have to attach a 12" x 24" beam to a the flange of a w12x53 column. any suggestions? i've already asked my boss to use a single shear plate with some shear studs on either side, with the amount required to transfer required shear, but he'd like some other ideas.
another thought is put some embed plates on either face and remove small portion of formwork at end of beam and weld plates to the column.
anyone have any details for this type of connection?

rc
all that is necessary for the triumph of evil is that good men do nothing.
edmund burke


weld some deformed bar anchors to the steel column and lap them onto the beam reinforcing:
how does that help to transfer shear? similar to a shear stud? also i'm worried about creep and fatigue failures.
rc
all that is necessary for the triumph of evil is that good men do nothing.
edmund burke

make a concret corbel out of a w section and fit that indis the shear links. transfers shear via bearing on top.
can your column take the additional moment due to end restraint?
can you weld an angle (stiffened if need be) onto the face of the steel column to provide a bearing surface for the concrete beam?
one step further might be to cast a embed plate into the bottom of the concrete beam (much as a precast concrete supplier would do), let the cip concrete go through intial curring and shrinkage, and weld the embed plate to the seat angle 30 or 60 days after casting the concrete.this would relieve some of the shrinkage problems.
i'd second the seat idea. you could create a "u" shaped saddle that is welded to the steel column and the concrete beam could be formed into it.
you could add some headed anchors as well to tie the two together. the saddle would take 100% of the vertical shear load. then you could weld deformed bar anchors to the column and extend them into the beam to develop any horizontal tension load that would occur.

this probably won't help you, but you never know...
is there a threaded deformed bar product available where you are? i would use reid bar and simply drill top and bottom steel into the existing column (having first checked that the reduced section isn't of concern). this done, box up and lap onto the "starters". very similar to the nelson stud idea, only easier.
i would also use some kind of bucket. also, unless i really need a moment connection at the end of the concrete beam, and designed my column to handle said moments, i would try to avoid using headed studs or dba's welded to the column flange face. if there was any chance of axial load, i would only use studs/dba's located below the neutral axis of the beam, to try to limit any moment generation.
otherwise, with a bracket or bucket formed on the column, you can treat like pinned connection, particularly if you add neoprene bearing pad. only moment would then just be from load eccentricity.
i've only done this once, and as such really like reading other people's opinions and views of potential pitfalls.
please correctly if you believe i am wrong, however, if you've got a existing column that was sized for a beam framing into the "far" side, and you now add a concrete beam to the "near" side, you've actually improved the behaviour of the column, n'est pas? this, of course, requires a check of the newly increased compressive load and actions on all supporting structure (including foundations), but fundamentally the local behaviour of the column should be improved... there is no way to discuss the overall system in general and i do not try; just thinking about the column itself.
what do you think?
cheers,
ys
b.eng (carleton)
working in new zealand, thinking of my snow covered home...
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
chapter 4 preliminary design properties of concrete huangyhg 产品功能分析 0 2009-09-07 11:23 PM
cantilevered steel i-beam capacity huangyhg 产品功能分析 0 2009-09-07 10:45 PM
cantilever steel beam at column huangyhg 产品功能分析 0 2009-09-07 10:40 PM
beam support along edge huangyhg 产品功能分析 0 2009-09-07 03:04 PM
12 x 6.5x 38 thick x 41 residential basement i-beam con huangyhg 产品功能分析 0 2009-09-06 10:30 PM


所有的时间均为北京时间。 现在的时间是 01:46 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多