camber in steel box girder skew bridges
hi guys,
hope soem one has tackled this issue recently.
i am just designing a 45 degree three girder system steel box girder deck rail bridge where the adjacent tracks are supported on two decks in between these three box girders which comprise of steel decking stiffened by t section below steel deck.
this is regarding camber to these steel boxes.
the bridge is skew but at every square cross section the soffit of the girders must be at the same level so as the achieve a horizontal deck section at any square xsection along the length of the bridge.
if some one has dealt with this kind of issue can you let me know how camber was applied to the girders?
cheers

so i understand this is a fabrication question, no?
whilst, your camber values need be derived from analysis, being all-steel helps. anyway as you know you'll only be able to meet your intent for a target hypothesis (this with behaviour being quite that expected, something not clear one is always to get, i yesterday read of some welding engineer doing practical field work for correction of camber by continuos phone exchanges with a seasoned also welding engineer in his eighties).
so engineering judgement will be needed on what kind of cambering will most favour the general behaviour. you may even do some complementary models to retouch nodes and even bracket some variation of the young modulus. some setups, particularly rigid links and their connections might turn critical upon movement, yet for some quite typical section nothing that won't have as well typical solutions.
thanks ishvaag.
since these are box girders, the "boxes" can be fabricated to any geometry you want. specify hold points for the camber and the fabricator will have to work out the fabrication issues to achieve that.
in short, achieving the proper camber is a fabrication issue, based on the specified geometry of the sections.
ron,
many thanks for this. this is what i was thinking but the question is do you extrapolate the camber for the individual girders and apply that between the farthest support (hold point) of the bridge so as to spacify camber.
regards,
shaurya
seems to me that if you specify the camber to take out the dead load the stringers will be level, or uniformely sloped at erection. if you have some residual camber in each stringer at erection, there will be steps in the cross section.
thans miecz.
my thinking is if i apply a unifom camber to all girders starting from the farthest points the girder will follow the chord of circle depending upon the skew of the bridge. in this case there will be no step if you take a sqare cross section at any point in the bridge span.

oh, i see. you're going to adjust the bearing elevations from stringer to stringer to account for the camber in the adjacent stringer?
i guess so because in skew structures you can't have any other option left.
shaurya241100fff"> - please consider some of the points raised in the posted article. it focused on skewed plate girders, but the effects of torsion induced in adjacent girders by deflection needs to be considered.

ralph
structures consulting
northeast usa
ralph,
thanks.
the discussion here is about steel box girders which are very efficient in carrying torsion but you are right that there must be some consideration for torsion effects also.
what i am still not very sure is that how can you control that twist because it can never happen that the camber for a number of box girders carryong deck and connected together will be same under serviceablity condition. there is always going to be some diffenece in camber and the cross section at any square section can never be in the same horozontal plane in other words the soffit of the girders will not lie in a plane and which is very difficult to satisfy.
cheers
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
camber in steel beams huangyhg 产品功能分析 0 2009-09-07 10:16 PM
camber for steel beams huangyhg 产品功能分析 0 2009-09-07 10:15 PM
box girder design huangyhg 产品功能分析 0 2009-09-07 04:34 PM
beam to girder analysis huangyhg 产品功能分析 0 2009-09-07 03:08 PM
【转帖】asme美国机械工程师标准目录2 huangyhg American standards 5 2009-04-26 02:38 PM


所有的时间均为北京时间。 现在的时间是 04:47 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多