几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-08, 04:42 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 deep roof deck

deep roof deck
i've got a 17 foot span that i'd like to use 4.5" metal roof deck. is this metal roof deck hard to get, or is it just as prevalent as 1.5 and 3" metal roof deck? any premium in cost?
check out our whitepaper library.
i just used 4 1/2" deck on a project in the midwest - yes there's a cost premium from 1 1/2" deck - you could call a few deck manufacturer's to find out. but it was available.
here's a list of some deck manufacturers. i don't re
thanks, jae. i have an epic catalog in front of me now. i guess the question now becomes this - is the cost increase in deck offset by the decrease in half the bar joists now needed?
that is going to be determined by a lot of different factors including what the client wants in the way of space, "look", skylights etc.
i just did a 60'-100' cmu brg wall building w/ longspan jsts spaced @ 10'-6" o.c. and 3" deck and the client definitely wanted the wider spaces and the cost was about a wash one way or the other.
that's right - we used the 4 1/2" deck more for dealing with the nature of our specific problem, not totally for an economic purpose. we were framing a light roof over an entrance ramp to an underground parking area where the long side of the roof connected to an existing wall. we needed a roof with minimal connections to the wall and also wanted to avoid birds nesting on the beams and deck gaps.
so we specified the 4 1/2" deck, supported by tubes (no flanges for nests!) and plugs to go into the flute openings over the beams.
note that with the deeper deck, you are generally working with narrow strips of deck, not 30" or 36" wide sections. so the labor is more intense as well.
don't forget that diaphragm strength may be significantly reduced.
i like b. csi above. their deep-dek offers an overlapping flange that can be screwed together from above so that there is no visible interuption of the surfaces from below. yes, the material will cost more than the 1.5 or 3" deck, but not only are you eliminating the structural complexity to support it, you eliminate the skilled welder and the special inspection of the weld to tie it into a shear panel. as for the 1' coverage, that to me gets the weight down to the place where you can handle the part without having to have a crane. it may be more labor intensive but to me it looks like it may be with fewer laborers at lower cost. i am planning on using 6.0" 18ga. deep-dek at a 32' span. part of this is possible due to no snow load in phoenix, but i wonder why the product is not in more widespread use. is it relatively new to market? or do we sub-optimise? i figure on the 13,000 sf building i am designing an inch of wall height is $1000. the dominant system here seems to be trusses made of angle iron with shear web bracing made of angle iron with the ends flattened into a "u" to fit between paired spar caps of angle iron. to me this looks like a really miserable welding/inspection/weld affected zone on spar cap/elastic stability of shear web situation that leaves me wondering. the axial splices on the spar caps are butt welds reinforced by lengths of rod laid in the angle iron and stitch welded. yeah the test article might have gotten the design a sji certification, but did you ever read the sji weld quality requirements? 1/16" of undercut? on 3/16" or 1/4" thick angle iron you might want to do better. oh and that structural depth required looks like $2/sf to build the walls to support it.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
concrete mix= reinfocing for exterior composit deck huangyhg 产品功能分析 0 2009-09-08 12:19 PM
buckling of arched sections of corrugated roof deck huangyhg 产品功能分析 0 2009-09-07 05:27 PM
b roof deck vs c floor deck - for floor use huangyhg 产品功能分析 0 2009-09-07 02:07 PM
attachment of roof deck huangyhg 产品功能分析 0 2009-09-07 01:50 PM
assuming metal roof deck rigid diaphragm huangyhg 产品功能分析 0 2009-09-07 01:39 PM


所有的时间均为北京时间。 现在的时间是 01:34 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多