attachment of roof deck
i have a situation that is as follows:
there is a steel tube that is connected to top of concrete wall (tilt-up panels). i have steel tubes that are and perpendicular to the continuous tubes that are on top of the wall. as you can imagine, i have 1.5-steel deck (18 ga) that spans on top of the rolled tubes. the continuous edge of the deck comes up to the radius/corner of the tube that is on top of the wall.
my question here is how do i fasten the deck to the tube so that i can achieve my diaphragm transfer to the wall. i have three options and wonder if anyone has input:
1.fasten the deck through the corner with #12 screws that are being used to fix the deck to supporting steel. (concern: full screw engagement may not take place due the corner on the tube).
2.weld about 1.5 inches of the edge of the deck to the tube.
3.use weld washer and puddle weld (get as much as we can) the deck to the corner and small vertical portion of the tube.
any input and other brilliant ideas are welcome.
regards,
lutfi
check out our whitepaper library.
lutfi...a similar problem can exist at continuous angle embeds on top of masonry walls. generally my solution is to make them weld an additional continuous angle along the tube or angle embed to provide full support, vertical and lateral, to the decking. then you can fasten the deck to the angle, either mechanically or by welding.
the extra angle can be fastened to the tube by welding or mechanical fasteners.
ron
if your diaphragm works with zero sidelaps, and you can transfer the diaphragm shear through all the connections at the perpendicular tubes, then you don't need to connect the deck directly to the tube on top of the tilt up panel.
daveatkins
ron and dave thanks for your input.
i elected to have them provide a continuous 1/8 bent plate on top of the deck that is screwed to the deck and to the tube steel. this provided means to transfer horizontal shear to vertical elements.
the detail was very mean and did not lend it self to adding a shelf angle and it was not accessible to weld.
regards,
lutfi
this may be a little late, but i know hilti has some mechanical fastenes that we have used for this type of situation.
thanks for the positive replies.
i asked the contractor to utilize bent plate that would be screwed to the deck and to the steel tube.
regards,
lutfi
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
assuming metal roof deck rigid diaphragm huangyhg 产品功能分析 0 2009-09-07 01:39 PM
asce figure 6-10 wind loads huangyhg 产品功能分析 0 2009-09-07 01:22 PM
advice on tearing off 2nd floor roof trusses cleanly huangyhg 产品功能分析 0 2009-09-07 10:20 AM
a flat roof huangyhg 产品功能分析 0 2009-09-07 09:05 AM
30 tilt-up and k-series owj roof collapse huangyhg 产品功能分析 0 2009-09-07 08:38 AM


所有的时间均为北京时间。 现在的时间是 02:15 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多