几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-16, 01:13 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 ension capacity of auger cast piles in limestone

tension capacity of auger cast piles in limestone
wright and reese (1978) ( mcvay et al., 1994) gives an equation for calculating average skin friction on auger cast piles in sand. the equation reads:
fs = po'ks tan (phi) =< 1.6 tsf
fs= average skin frictin on pile
ks= 1.1
tan(phi)= tangent of the internal angle of friction of soil
po'= average effective stress along length of pile
since my case conforms to a case where a auger cast pile is to be embedded in limestone (non-weathered), whose angle of friction could fluctuate from 35 to 45 degrees, does the equation given by wright and reese could correctly approximate the tensional capacity of such a pile? or the fact that the augering process by itself would tend to smooth out the rock surface to such an extent, that the frictional angle of the rock does not represent the reality at the interface between concrete and rock?
thanks
francisco j. fuentes p.e.
miami-dade water and sewer department.
have the driller put a bell at the bottom of the hole. this will give you something to pull against. what kind of tension are you putting on the piling?
richard a. cornelius, p.e.
you need a geotechnical engineer familiar with the area. although the equation itself is generally correct, there are more limitations than <1.6 tsf. ks varies for different n-values(or more accurate strength parameters), and po should be limited to 20*pile diameter. the approach works well in sands and sandy clays, but limestone acts differently than its n-value or phi value would indicate. the frictional angle of the rock, as well as the overburden stress, are not the same as for soil. if you are doing preliminary calcs, use a lower bound. will the gear box for the auger be strong enough to auger through non-weathered limestone?
i understand the "limestone" in the southern florida area is not what others consider to be true limestone. it's best to contact a geotech from your area.
i understand that the "limestone" in your area is very porous and can be drilled into with auger-cast rigs. in fact, the frictional capacity of this type of "limestone" is very high because the grout from auger-cast operations actually infiltrates the "limestone" and a very high bond strength is developed.
talk to a local, auger cast pile contractor.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
precast pile connection to pile cap huangyhg 产品功能分析 0 2009-09-15 02:22 PM
auger-cast pile huangyhg 产品功能分析 0 2009-09-07 01:53 PM
auger cast piles huangyhg 产品功能分析 0 2009-09-07 01:52 PM
auger cast grout piles huangyhg 产品功能分析 0 2009-09-07 01:52 PM
【转帖】error c2664 yang686526 DirectDWG 0 2009-05-05 09:34 AM


所有的时间均为北京时间。 现在的时间是 04:59 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多