几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-16, 01:08 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 emporary structure design 9construction site protection fen

temporary structure design (construction site protection fen
i have a situation in which my duty as a structural engineer is to tell my client if the code (ibc) has any design requirement for temporary structures like construction site protection fence design. does ibc say anything about this? i looked at ibc, and could not find anything specific on how to design such temporary structures? in my case, the temporary fence at the construction site fell down, and hurt the worker. now, it is legal issue.
i would appreciate your inputs.

dont you rent those? why would you spend the time and money to design and fabricate it?
never, but never question engineer's judgement
coengineer, thanks for the response.
i understand what you say. however, the problem is that the fence fell down, and somebody was hurt. now it is in court. the matter of fact is the court believes on written evidence, not your personal judgement.
again, the fence supplier must provide some evidence that the fence installation is per code. as a supplier you can not just supply something that is not safe to the public. does it make sense? and my question is: is there any provision for this in ibc on how to design it?
i don't know about the ibc code, but, depending on your country of origin, you might start by checking with osha standards. if it was a worker that was injured, it's an l&i claim too.
mike mccann
mmc engineering
section 3306 on ibc maybe?
never, but never question engineer's judgement
from the 2007 obc (based on the 2006 ibc)
105.2 work exempt from approval. approval shall not be required for the following:
building:
2. fences not over 6 feet (1829 mm) high.

don phillips
it has been my experiance that the general conditions section of the specifications defines the design of temporary construction like fencing, sheeting and shoring as the responsibility of the contractor. most of those kinds of things can be found in the osha standards for protection of workers. so, as the structural engineer of record, i don't see how you could be held libel, but if it is in court already there's no telling what can happen.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
reinforced concrete building design step-by-step huangyhg 产品功能分析 0 2009-09-15 05:12 PM
in a design and built contract,i ha huangyhg 产品功能分析 0 2009-09-09 07:16 PM
dots requiring pe stamps on shop drawings huangyhg 产品功能分析 0 2009-09-08 07:18 PM
design build huangyhg 产品功能分析 0 2009-09-08 05:13 PM
【转帖】asme美国机械工程师标准目录2 huangyhg American standards 5 2009-04-26 02:38 PM


所有的时间均为北京时间。 现在的时间是 02:37 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多