几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-15, 11:12 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 skid mounted generators

skid mounted generators
maybe someone has some input on this subject.
i am trying to determine steel fabrication costs for skids constructed of w14 x 43# beams.
the material costs is not a problem, i am looking at labor cost or cost by the tonnage.
if tonnage cost is applicable, does this cost assume labor & material combined? what is present tonnage costs?
any suggestions are welcome.
david
it depends on how complicated the fabrications is. i have seen structural steel fabrication vary from $1000 per ton to $2500 per ton.
if you have simple beams, standard shear (clip angle connection), minimum moment connection and welding i would use $1200 per ton. keep in mind the paint and finish of the steel can add a lot of cost. there is a huge difference between simple shop primer, hot dip galvanizing and inorganic zinc coating. also be selective in your beam sizes because on some sizes, you will pay a premium.
another consideration is to review your beam length. what i mean is the steel beams come from the mills in the following lengths (40, 50 and 60 footers). the shops will cut your beams from these lengths, try not to leave lots of waste because the shop will charge you for the full length of the next half length increment.
raw steel cost per pound is about $0.29 (about $580 per ton).
i would call some of the local steel shops and inquire for cost range. i find them to be very helpful.
lutfi,
i first would like to thank you for your time replying to my inquiry, it is appreciated.
the skid is of oilfield design, 100% welded, 300" x 96", with a loading hitch welded on both ends of the skid.
there are 7 crossmembers incorparated within the skid.
there are 6 beams which weld on top of the skid for the mounting of engine, cooling system etc.
the loading hitchs will be constructed of heavy wall pipe to accomodate a winch truch moving them on location.
there will be no exterior walls, or vertical componets welded on the skid.
thanks for the reminder re: paint & finishes.
have a good weekend.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
skid lifting impact factor huangyhg 产品功能分析 0 2009-09-15 11:12 PM
i-beam mounted trolley huangyhg 产品功能分析 0 2009-09-09 06:33 PM
floor vibration analysis for a platform mounted by equipmen huangyhg 产品功能分析 0 2009-09-09 12:50 PM
anchorage for roof mounted ahu huangyhg 产品功能分析 0 2009-09-07 12:01 PM
anti skid systems huangyhg 精密机械 0 2009-09-05 10:21 PM


所有的时间均为北京时间。 现在的时间是 09:17 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多