sheathing attachment to bottom and top plate
in a single family residetial application (100 mph wind zone), the standard assembly for a nominal 8' high wall is as follows:
component height
single top plate 1-1/2"
pre-cut studs 92-5/8"
double top plate 3-0/0"
total 97-1/8"
sheathing with a dimension of 48" x 96" is then nailed to this wall assembly. if the sheathing is then fastened to the bottom plate (say 1/8") off of the bottom, then the top of the sheet of osb (or plywood) will fall at a point of 96-1/8" above the floor, or 1" short of the top edge of the top member of the double top plate.
if nailing of the fastners to the double top plate is held off the edge of the sheathing by the minimum reccomended distance of 3/8", then the nailing will be a maximum of 95-3/4" off of the floor, or 1-3/8" below the top of the top member of the double top plate. thus no nails are being placed into the top member of the double top plate.
with the industry standard pre-cut studs, the wall is designed to be built high enough that the ceiling drywall can be installed with the ability to place 96" of drywall (either two 48" boards in the horizontal plane, of one 96" board in the vertical plane)whle keeping the bottom of the drywall board off the floor aproximately 1/2" to keep it from getting wet when water is on the floor (mopping, etc.).
this has never been a problem, but a local inspector is now questioning the assembly. i can't find anything that requires that the sheathing to run continuos from the bottom edge of the bottom plate member to the top of the upper most top plate member. if so, we would need to lower the top of the wall, or place the sheathing horizontally, with a ripper piece in the center two feet of the wall, resulting in thre pieces of sheating in the vertical plane.
does anybody have information regarding this application? what are you designing?
thank you in advance,
randy thompson
i never understood why pre-cut studs are 92-5/8", so thank you for the insight. as long as the top ply of the double top plate is adequately nailed to the bottom ply of the double top plate, then you can just nail the sheathing to the bottom ply. i would not be comfortable with the nails going into the seam between the two plies.
daveatkins
this is why the next standard length of plywood sheets is 9 ft.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
inferior built shed - want to shore up huangyhg 产品功能分析 0 2009-09-09 07:33 PM
double top plate on stud wall huangyhg 产品功能分析 0 2009-09-08 07:25 PM
bt limits huangyhg 产品功能分析 0 2009-09-07 05:24 PM
a column at center of tank bottom plate huangyhg 产品功能分析 0 2009-09-07 09:03 AM
10 ft continuous weld beam to cover plate huangyhg 产品功能分析 0 2009-09-06 10:26 PM


所有的时间均为北京时间。 现在的时间是 12:53 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多