几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-15, 07:41 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 rubber pad 2 truss connection

"rubber" pad @ truss connection?
i am looking at an existing metal building with a 3'-6" deep steel truss clear spanning 64'. the top and bottom chords of the truss frame into the flange of vertical columns (not tapered)at each end. however, the bottom cord connection has a "rubber" pad shim between the column flange and the truss cord connection plate (this is not the case at the top cord, the connection is steel to steel) i do know the buildings manufacturer and will contact them to get a response.
has anyone seen this type of connection before and what is the purpose of the "rubber" shim?
i have seen many elastomeric pads used beneath the bottom flange of bridge girders, maybe a bearing?
jheidt2543,
i think the purpose of the rubber pad is to make the truss-to-column connection a simple connection, and avoid a moment in the column due to the gravity loads.
i assume the stability of the building for lateral loads is provided by other structural elements.
welding (or providing fixity) at the bottom chord in the connection to the column has resulted in a number of connection-induced failures, hence some have devised to set them free along the plane of the columns-truss plane. this is more or less tantamount to what dlew says, support through diagonal being brought to the top corner.
so, the pad prevents a moment connection, yet allows the bolted connection to brace the bottom chord of the truss?
yes, there are other bracing systems in the building.
several posters have nailed the purpose of the pad ... to avoid an end moment connection to the column.
i've investigated several failures where the end connection was designed as simply connected but erected with hard connections on top and bottom chords.
i've made it a practice to stop the bottom chord prior to reaching the end region.
i finally found some information regarding the rubber pad from the building manufacturer. this is a metal building built around 1975, so it has taken some time to find the info., and with that in hand i thought i would pass it along. it pretty much confirms the above responses
"the sidewall columns are welded "h" sections, non-tapered, and pinned base. the columns are framed into the roof truss for lateral load resistance by means of a knee brace, creating an indeterminate frame. a rubber deflection pad is also used with the knee brace to reduce the effects of roof live load upon the sidewall column"
thanks you all for your comments!
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
piggyback wood trusses - connections huangyhg 产品功能分析 0 2009-09-15 12:18 PM
permanent truss bracing huangyhg 产品功能分析 0 2009-09-15 12:11 PM
metal truss designs huangyhg 产品功能分析 0 2009-09-10 01:46 PM
lateral wind loads - residential construction huangyhg 产品功能分析 0 2009-09-10 09:57 AM
fundamental truss question huangyhg 产品功能分析 0 2009-09-09 02:11 PM


所有的时间均为北京时间。 现在的时间是 05:00 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多