默认 rebar detailing

rebar detailing
we are currently constructing several low rise (2, 3 & 4 story) office buildings. all cast in place with concrete shear walls. the column spacings and beam spans are quite uniform so we are looking for ways to pre-fab the beam cages & slab steel and drop them into place. i recon this could be done by pre-fabricating a beam cage with all full lenght bottom bars and 2 small top bars just to tie all the stirrups in place. the main top bars could be loosely placed inside the beam cage and easily slide thru the column cage once the beam cage is set in place. if necessary we could also slide a few short bottom bars thru the column cage as well. however aci requires that bottom bars extend 6" into the supports (unless otherwise specified by the arch./ eng.) which makes it difficult if not impossible to place a prefabicated beam cage between the column cages or a prefabricated mat of slab steel (bottom bars) between the beam cages. has anyone found a way around this, surely someone has done this before.
not only 6" into the supports, but check out the end of chapter 7 - structural integrity requirements requires additional bottom and top continuity bars that must be satisfied.
what you are proposing can be done. it would save time, but would probably add additional labor and materials in that you'd have to have more spliced bars to accommodate the insertion of the cages.
i am with jae on this. the reinforcing sub-contractor asked to do the exact thing you are asking. it did indeed to additional bars to accomplish. did it save time? probably debatable. did it make it easier for the guys tying the steel? yes. if you intend to do this, be sure and note it as such on your drawings. if a sub asks to do this, be sure that he asks before you get a price, to truly see if there is a cost savings. i suspect that it could be either way.
thanks for your help, i will discuss the issue with our eng. & detailer.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
rebar detailing 9offset bars0 huangyhg 产品功能分析 0 2009-09-15 04:42 PM
microwaves and rebar huangyhg 产品功能分析 0 2009-09-10 01:57 PM
greased rebar huangyhg 产品功能分析 0 2009-09-09 03:07 PM
flame cutting rebar huangyhg 产品功能分析 0 2009-09-09 12:15 PM
epoxy coated rebar huangyhg 产品功能分析 0 2009-09-08 10:38 PM


所有的时间均为北京时间。 现在的时间是 01:28 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多