默认 rail bridge loading

rail bridge loading
hi, am looking at a design and want to use typical rail loadings. i have a document here which is uk based. shows 4 250kn point loads 1.6m apart followed by a udl of 80 kn/m. now heres the question is the loading per rail? i.e. 2 lines for each track. or is this axle load if you like across bridge and 80 kn/m is line load acting across whatever the width of the bridge is.
just to clarify i'm not designing a bridge and no one here knows answer as we are not bridge designers, but i need to determine loading pattern.
check out our whitepaper library.
the only railroad code i know is from the american railway engineering and maintenance of way association (arema). sounds like you are in europe so don't think this will help, but maybe could answer some questions.
you could look in bd37/01 or bs5400. appendix d of bd37 gives a commentary on the basis behind the loads. i am not a bridge engineer either but i understand it is axle load per lane.
yes looked at those docs but it wasn't clear. i have found from another source now anyway. the loading is split between rails. so 250 is split 125 each side or dispersed through sleepers and ballast (if ballasted). thanks for the help guys.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
golf cart bridge design1 huangyhg 产品功能分析 0 2009-09-09 02:47 PM
china bridge fails huangyhg 产品功能分析 0 2009-09-07 11:33 PM
bridge loading huangyhg 产品功能分析 0 2009-09-07 05:13 PM
bridge loading factor huangyhg 产品功能分析 0 2009-09-07 05:12 PM
arema rating steel bridge load combinations huangyhg 产品功能分析 0 2009-09-07 12:50 PM


所有的时间均为北京时间。 现在的时间是 09:29 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多