几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-15, 03:32 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 punching shear of pile caps

punching shear of pile caps
hi, when checking against punching shear at 1.5d zone (according to uk code), but at whatever distance your code states. how do you deal with overlapping zones, say you have 4 piles and all perimeters overlap?

if they overlap a good bit, i'll draw a straight line between the tangents of the 1.5d zone to make a block around the pile group; it will become sort of a rounded corner square (for 4 piles in a square formation).
if you "heard" it on the internet, it's guilty until proven innocent. - dcs
i like to be conservative in designing pile caps, so would check the punching shear based on one pile and the design load of the pile, ignoring all others. don't forget to check punching shear at the supported column.
sorry i dont see how that is conservative if the zones overlap?
look at it this way. if the zones did not overlap, you would check punching shear as normal based on the specified perimeter. if punching shear is inadequate, you increase the depth. at some point, this increase in depth makes the zones overlap. what then, do you check punching shear based on the external perimeter around all the piles? that doesn't make sense.
it seems to me that if the zones overlap, you don't really have punching shear, but rather beam shear. with 4 piles, you would use the full pile cap width and effective depth. check punching shear under the column.
if a pile is going to punch through the pile cap, it doesn't matter if the pile next to it is within the perimeter, it will still punch through base on it's own critical surface perimeter.
but if the zones overlap wont the shear stress at this point be greater i.e. some combination of the stresses imposed by the two piles.
if cones overlap, you have developed a group pile w/r to the cap (it feels one big pile below). yes, check single (each) pile capacity as usual, then check the outer perimeter that encloses the pile group.
ok lets complicate this further. piles are not evenly loaded, three piles are in varying compression loads, one is in tension. how does that effect the combined perimeter?
if you have couple in pile cap, it becames a beam, or slab. one way action tends to govern the design.
the overlapping condition can be eliminated (for coupling piles) by adjust the pile spacing farther apart (note: the two cones are in opposite directions vertically). i wouldn't worry too much about overlap in this case, draw cone diagram with stresses along cone surfaces, you would know why.
i understand, my probelem is due to exsisting structures i cannot space piles out further. ah the joys.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
punching shear in beam huangyhg 产品功能分析 0 2009-09-15 03:31 PM
punching shear capacity of piled slabs huangyhg 产品功能分析 0 2009-09-15 03:30 PM
can i count on shear-friction capacity of the reinforcemen huangyhg 产品功能分析 0 2009-09-07 10:22 PM
block shear vs. shear rupture at connections huangyhg 产品功能分析 0 2009-09-07 03:57 PM
beam shear huangyhg 产品功能分析 0 2009-09-07 03:01 PM


所有的时间均为北京时间。 现在的时间是 04:31 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多