precast concrete piles
anyone have any details on precast concrete pile splices, and pile cut-offs? interested in both plain reinforced and prestressed piles.
how would you cut off the pile at the pile cut-off elevation and dowel it to the pile cap or slab if it's a prestressed pile?
check out our whitepaper library.
fdot standards:
here is one specification for piling cut off, see paragraph 7.4
ucfse and slideruleera - excellent links and information you have provided. thank you, it is much appreciated!
watch for details of splice when tension load is present in concrete piles!
regards,
lutfi
prestressed precast piles are pretty much standarized. a local precaster should be able to give you details of pile crossections. splices are avaiable, but are usually installed at the precaster so they match. they can get very expensive. there is a sweedish system that is very good. check trucking lenths with the precaster. typically maximum truckable length (with permit) is 100 to 120 feet. cut off can be accompliseshed with cut-off saws or special pile head cutters designed for precast piles.
somewhat dated:
there was a show last night on the history channel on the construction of the lake pontchartrain bridge that had pretty good coverage on the manufacture and installation of the concrete piles.
the piles used were spun cast sections (? 4 5/8" tk x 30'lg) with 12 or more holes longitudinal holes for tensioning, the sections were stacked and post tensioned and grouted. at the site the piles were placed with a steam driven hammer and trimmed to height with a concrete saw. i think they call the cap a bar cap, which had been precast onshore and from the picture the cap was anchored to the pilings with a concrete plug. there were circular reinforcing cages attached to the bar. the precast bridge sections were set on the bar. i didn't see but one pin on at each corner. this maybe the reason it came apart like our i-10 bridge.
this took place in the 50's but a very similar system was recently used on 3 fairly long bridges across our bay. the only difference was that more of the caps were cast in place.

here is an interesting website that my help you. i saw the name on a piece of equipment being used on a bridge repair.
another consideration for pile cut-offs is the mild reinforcing steel extending from the pile top (used to help tie the pile to the footing). from what i remember, these bars are often only about 12 ft long, so if the pile cut-off is excessive you won't have much bar left in the pile.
caltrans (californis dot) also shows reinforcing details in their standard plans manual.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
pre-cast concrete piles huangyhg 产品功能分析 0 2009-09-15 02:05 PM
concrete sampling guidlines huangyhg 产品功能分析 0 2009-09-08 12:34 PM
concrete mix= reinfocing for exterior composit deck huangyhg 产品功能分析 0 2009-09-08 12:19 PM
concrete corrosion in partial saturated condition huangyhg 产品功能分析 0 2009-09-08 11:54 AM
chapter 4 preliminary design properties of concrete huangyhg 产品功能分析 0 2009-09-07 11:23 PM


所有的时间均为北京时间。 现在的时间是 07:30 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多