partial rebar development
i have a situation where the stair guy is attaching a stringer to a bent plate at edge of slab where the slab is cantilevered out past the beam 1'-6".
this was not the intent of the original design and the slab isn't poured yet. i am detailing some rebar in the top of the slab(attached to the bent plate at edge of slab) to take this moment back into the slab.
i can't get a fillet weld around a #4 bar to develop the bar unless it is like a 1/2" weld (that's not going to work). i ended up counting on the length i have from edge of bent plate to centerline of beam (1'-6") to partially develop the rebar and am only counting on the weld to the bent plate for the remaining portion.
does anyone see any problem with this?
why can't you weld all around the #4 bar? you should only need a 5/16 weld around to develop it, at grade 60.
why not hook the top bar?
if the load is in the stringer, then in the bent plate, all of it would need to go into the rebar, not a portion of it.
jmeic-
i could hook the top bar, but the load needs a way to get into the slab. the stringer is attached to the bent plate, not the slab itself and there are no studs from bent plate into slab.
ucfse-
how do you get 5/16"? a #4 = 0.2 in^2 * 60ksi = 12k. the length of fillet weld will be pi*d = 3.14*0.5 = 1.37". a fillet weld (using lrfd) is good for 1.392k/in/16th in.
i take 12k/(1.37*1.392) and get a required fillet weld of 6.3 16ths --> 7/16" fillet weld.
am i doing that wrong?
i am welding the rebar all the way around, but given what i showed above, i couldn't get it to work with the weld only.
nutte-
i know all of the load has to go into the rebar, not a portion of it. i don't have to take all of it into the rebar at the weld, though, do i?
it needs to be developed at point of max moment, not at the end of the cantilever.
oh, missed that part. ok, so why not anchor bolt the bent plate to the slab?
what exactly do you mean by anchor bolt the bent plate to the slab?
if it is what i am imagining (bolting through the bent plate and having a nut on the end of the bolt into the slab), it seems like it would need to be a relatively long bolt to develop the rebar. also, i don't think the architect wants to see a nut on the outside of this bent plate as it is exposed below.
i thought about just adding studs on the bent plate, but i have the same problem with developing that into the rebar if it is just hooked.
can you just use a #5 or #6 bar to get enough diameter to use a 5/16" weld and then only count on the bar as if it was a #4?
i think the anchor, stud or bolt, only needs to carry the force into the concrete (appendix d), not develop the strength of the rebar. by the way, i think your length of fillet weld is 1.57".
just get the thing ground to a cone and butt welded to the plate - end of story.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
microwaves and rebar huangyhg 产品功能分析 0 2009-09-10 01:57 PM
leave rebar exposed for future construction huangyhg 产品功能分析 0 2009-09-10 10:04 AM
greased rebar huangyhg 产品功能分析 0 2009-09-09 03:07 PM
flame cutting rebar huangyhg 产品功能分析 0 2009-09-09 12:15 PM
epoxy coated rebar huangyhg 产品功能分析 0 2009-09-08 10:38 PM


所有的时间均为北京时间。 现在的时间是 11:33 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多