默认 paramerters for the structural design of 33kv duct bank unde

paramerters for the structural design of 33kv duct bank unde
i am interested in the design parameters for the design of an 33kv duct bank under a main road. an example of an actual design will help.
find a job or post a job opening
1. compacted subgrade under the ductbank.
2. schedule 40 galvanized steel conduit spaced using available commercial plastic conduit spacers manufactured for this purpose.
3. 3000 psi concrete (properly formed, placed, vibrated & cured) with the top of concrete painted or stained red (any future excavation will show the red colored concrete and warn that this is a ductbank).
4. heavy electrical grounding cable (typically 500mcm) running (loosely) on top of the concrete - frequent electrical connections to ground rods. test for adequate grounding.
5. backfill with select, well compacted soil.
6. accurately label and show location of ductbank on as-built drawings.
if in the us, the owner will have to locate forever more. one thing that i always wanted and could never get from the elec. utility, the elevation of the top and bottom of the ductbank. as you construct, please get these.
i am asking about pvc duting under roads
you will also want to provide some type of strap or bar to prevent the ducts from floating to the top of the concrete when it is poured. this is often easily accomplished with extra rebar laying around the site. good luck.
ttec, i would not use galvanized steel conduit unless all three phases can be installed in the same conduit and the current in each is balanced. putting only one phase in a steel conduit will cause heating problems. schedule 40 pvc can be used in a direct bury application or encased in concrete. if concrete encased, care must be used to place rebar in balanced field to avoid rebar heating. i avoid rebar in duct banks where i can.
carlon conduit (216-464-3400) has a publication for direct buried conduit. it does not take much cover over a direct buried conduit.
remember to watch your fill factor. a spare conduit is cheap to install the first time, but very expensive after the fact.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
in a design and built contract,i ha huangyhg 产品功能分析 0 2009-09-09 07:16 PM
fee development for structural design criteria services huangyhg 产品功能分析 0 2009-09-09 11:25 AM
design build huangyhg 产品功能分析 0 2009-09-08 05:13 PM
contract issues - structural steel connection design in the huangyhg 产品功能分析 0 2009-09-08 01:40 PM
【转帖】asme美国机械工程师标准目录2 huangyhg American standards 5 2009-04-26 02:38 PM


所有的时间均为北京时间。 现在的时间是 01:53 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多