默认 hanging from precast double tee stem

hanging from precast double tee stem
i am thru bolting the stem of a precast prestressed double tee to support a hanger. i am trying to calculate the shear breakout force of the bolt but am wondering if the bottom of the tee goes into tension and thus reduces the allowable shear.
can i use 2 x sqrt of f'c per 11.4.1 for the min. allowable?
how high up on the the stem would you recommend the bolts to be? i know this depends upon the breakout force....
i might try using an app d approach. i would try to at least get it a few inches above the strands. how high above depends on the load.
through bolting a precast tee stem is not typical.
first, the location of the through bolt will need to be above the strands and any longitudinal reinforcement. this must be coordinated with the precaster (this is not an option and if you don't do it you may need to replace the tee or worse). you will probably find that you will need to through bolt about 12" from the bottom of the stem. at this point you will probably not need to concern yourself with breakout, but if you do...
consider that you are now above the main structural reinforcement of the precast element and it is hard to believe that any load that can be sustained by the tee would cause failure at that location.
this is a common detail for existing buildings with double tees.
in my 10 years experience with precast parking garages, the only through bolting that was done was through the flange for bollards or through the spandrel panels for rare instances.
what are you hanging that requires a through bolt through the stem? usually any piping and conduits can be managed with an expansion bolt. even with expansion bolts i still prefer to limit their connections to the flange.
this is for hanging piping in industrial buildings. for new buildings, we would have sleeves cast thru the webs, but for existing buildings, one needs to drill thru the stems and support hangers with u-straps.
to answer your question, yes the stem goes into tension at the middle of the span under full loading. unless other criteria was listed, a precaster will allow some tension at the center span.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
cut double tee stem huangyhg 产品功能分析 0 2009-09-08 04:17 PM
capacity of existing precast double tees huangyhg 产品功能分析 0 2009-09-07 10:52 PM
1950s bldg - precast double tee capacity huangyhg 产品功能分析 0 2009-09-06 10:41 PM
【转帖】模拟南方软件下polyline线的输入(并进行修改),不敢独享 - 精华帖集合 yang686526 ObjectARX(VB.NET/C#) 0 2009-04-29 05:37 PM


所有的时间均为北京时间。 现在的时间是 12:15 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多