几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-09, 11:32 AM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 fence pole embedded in concrete

fence pole embedded in concrete
ok, this is my first post, i'm a liiittle nervous!
can anyone please point me in the direction of 'how to' or a reference for the following -
i have a fence on top of a concrete wall. we calculated the required sx of the post based on the wind, etc. now we have to determine the post embedment into the 12" wide concrete wall.
we do not know at this time the reinforcement in the wall as that is being done by another party. since the moment is not all that large (about 15 ft.k) i thought the first thing i would do is simply determine if the shear strength of the concrete alone would be sufficient.
i tried using the vc formula from chap. 11 (11.3.1.1) if i remember correctly, but it rendered a very high shear strength.
so, i decided to go to appendix d, but each time i attempt to calculate the break-out strength i get frustrated because it so often references "headed anchor studs" or it seems the 4.5" dia. pole i have coupled with the embedment throw the formula and the results off.
is there another formula or method i should be employing?
thanks!
i would check the moment capacity of the wall using the effective width as defined by pci. in this case it would probably be 6x the wall thickness or 0.4x wall height.
sx also is not a function of the load, but will be used to calculate the stress in the post. make sure to not exceed allowable stress for the material.
appendix d can be used in your case, but also check bearing of your materials. your le will equal hef in your case but because your anchor is so large i might not measure ca from the center of the post, but from the face of the post to be conservative.

it would be much easier from a construction standpoint to use a baseplate on the post and then anchor it to the wall.
i believe your question is how much embedment is needed for the post (to achieve fixity and not exceed the concrete strength).
use the projected area of the post and consider that the force from your moment couple will not crush the concrete at the top of the concrete, and that the tension in the concrete created by the force will not exceed the concrete strength (with or without reinforcement, depending on your condition). use an embedment length that will satify the reduction in couple force necessary to satisfy both conditions. please note that the tension consideration will likely prevail as you will not likely be able to get enough compression at the post wall to make any difference.
appendix d is based on test for anchors with less than 25" of embed and an anchor less than 2" dia. don't think the equations would really predict the case of an embedded pole.
that's exactly what we've been finding sandman...
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
concrete sampling guidlines huangyhg 产品功能分析 0 2009-09-08 12:34 PM
concrete mix= reinfocing for exterior composit deck huangyhg 产品功能分析 0 2009-09-08 12:19 PM
concrete embedded bolt pullout strength huangyhg 产品功能分析 0 2009-09-08 12:02 PM
concrete corrosion in partial saturated condition huangyhg 产品功能分析 0 2009-09-08 11:54 AM
chapter 4 preliminary design properties of concrete huangyhg 产品功能分析 0 2009-09-07 11:23 PM


所有的时间均为北京时间。 现在的时间是 04:40 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多