几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-08, 10:29 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 engineering hours for 4 -story timber motel

engineering hours for 4 -story timber motel
we are puting together a cost estimate for a 4-story timber motel design. can any body help me decide how many structural design engineering hours needed for this type of design? thanks a lot.
find a job or post a job opening
but sure you'd need to know the size, complexity, ground conditions cladding arrangement etc etc before you could start estimating. thats like saying how much is a car?
luke,
there is a lot of work involved in this type of project. abnormal loads mean that you need to check all
thanks everyone, i understand it is not simple. i just want to get an idea to decide "go" or "no go". for eample, is 160 hrs enough for structural engineering design only? or just too much? thanks.
i usually stay away from calc-n-sketch only projects. start with the minimum fee for this work that you will be happy with for this job (and still win the bid), divide by the minimum hourly rate (times overhead factor) that you are willing to accept. if your gut feeling says you can do the job within that time, go for it. if not, stay away.
try figuring it up several ways and get a feel for a range of costs. for example, estimate number of sheets and fee per sheet, estimate number of hours and fee per hour, estimate fee per square foot and estimate fee as a percentage of the construction cost. check out these numbers for your past projects and get a feel for what you've been doing and what you are planning to do with this project. it's a bit of work but at least you'll have a feel for the numbers instead of throwing some hours at it.
use 4% to 6% of the estimated construction costs and provide plans, elevations, sections, and details necessary for timber construction. include review of architectural, hvac, plumbing, and finish schedule for structural coordination.
4% to 6% sounds more like what a whole design team (architect, structural, electrical, mechanical, etc) gets for design fees for typical building projects.
in my part of the world, structural fees are generally in the order of 0.5% to 0.75% of construction costs. maybe 1% if something is particularly complicated and the lead discipline is feel particularly generous that day.
i generally use anywhere from 0.5% to 2% of the estimated construction cost for the structural portion. i use the smaller percentage for the larger projects.
i also use the estimated number of sheets with a cost per sheet (drafting plus engineering), and an estimated number of hours for the engineering, based on an engineering task breakdown. i use the same number of hours of drafting as for engineering.
for residences i will use anywhere from $.075 to 1.50 per square foot, depending on the complexity. that is just for the structural calculations and redline markups. drafting would be more.
i combine the three figures, and see whsat appears to be reasonable for the project, factoring in simplicity, repetition, complexity, and other mitigating concerns.
hope this helps.
mike mccann
mccann engineering
my experience with this type of project is the architect provides drafting, and no construction phase services are included, so my fee doesn't need to be so high.
for engineering and red marking the architect's sheets, if the design is not overly complex, and you don't have to go to any meetings, 160 hours is too high. 40 to 80 hours might be more like it.
but like everyone else is saying, i know too little about the project to give you an accurate answer.
daveatkins
i agree that if you base the fee off of construction cost structural is generally around .75%. sometimes more, sometimes less, depending on the type of work.
for a four story wood framed i would think that the fee would be 0.75% to 1% of the estimated construction costs.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
end grain epoxy gluing of threaded rod into timber pile huangyhg 产品功能分析 0 2009-09-08 10:17 PM
does one have to be a p.e. to do value engineering huangyhg 产品功能分析 0 2009-09-08 07:16 PM
difference between mce and ms structural huangyhg 产品功能分析 0 2009-09-08 06:41 PM
cad and engineering fee spli huangyhg 产品功能分析 0 2009-09-07 06:05 PM
5 story wood building huangyhg 产品功能分析 0 2009-09-07 08:50 AM


所有的时间均为北京时间。 现在的时间是 11:51 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多