默认 embedment in concrete

embedment in concrete
i am starting another thread hopping i will get some responses this time.
i have been searching for a good approach on the design of post embedment in concrete slab that varies in thickness from 4" to 7". aci 6.3 discuss this subject but it does not in any way describe a method of design. the post is subject to a lateral load of about 640lb on the top of the post due to wind and due to the fact that the post is a member of a glazed railing. as you know the minimum load that the railing should be designed for is 50 lb/ft along the top rail and 200 lb at any point along the rail. however, when the railing is glazed railing and is subject to high wind pressure the load increases. therefore, the embedment in concrete slab must be improved. how would you approach this problem?
check out our whitepaper library.
assuming decent quality soil:
1) thicken the slab around the post area
2) add cont. reinforcing bars around the posts in these thickened areas
3) place post in a concrete pier for the embedment length required beneath the slab
4) design the embedement length/diameter of pier according to ubc embedment formulas
i am not an expert. but, is it not easier to bolt the post ? or is it going to be more expensive.
i have designed many railings of this style utilizing a 3d frame analysis program. designing one post like a flag pole is asking for problems. the entire railing should be considered a unit. keep the posts 5'-0"+/- c/c. if there is a 4" high toe guard, use it in the anchoring design. post base plates with epcon anchor bolts work well with cosmetic covers of alum. or stainless stl.
with a high moment and little vertical load, you may end up with a very large footing if you don't use a pier. using a program to model this would be too time consuming to me.
for an application such as this (glazed or solid insert), the loadings on the post can be tremendous. if you have no opportunity to stabilize the top rail by attachment at the ends, then the post must be designed like a "flagpole". while you can get some capacity increase by using a unit or segment analysis, it will likely prove to be minor.
assuming you have this condition at other than a ground floor (elevated slabs), then the embedment condition becomes somewhat difficult. for high moment at the embedment, the tension component of the couple created in the concrete can be quite high and will require auxiliary reinforcement with a loop or hairpin bar wrapping each embedment area. this is necessary to prevent blowing off the edge of the concrete. due to the potential for reversals, this reinforcement should be top and bottom.
i don't have much better advice than you've already had but i recently looked at handrail post design for a manufacturer of stainless steel posts. the conclusion i came to was that most handrails (certainly in this part of the world) do not comply with the requirements. they are quite often post fixed with bolts and this simply does not work unless you have a massive base plate and can keep your post a decent distance from the edge of the slab. both of these solutions are usually not aesthetically acceptable. the only way to make it work is to have an embedded post or plate and then the considerable bending forces near the edge of the slab need to be contained as ron said with reinforcement. one solution is to have a post base bracket with reinforcement welded to it going back into the slab.
carl bauer
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
concrete sampling guidlines huangyhg 产品功能分析 0 2009-09-08 12:34 PM
concrete roof slab load huangyhg 产品功能分析 0 2009-09-08 12:34 PM
concrete mix= reinfocing for exterior composit deck huangyhg 产品功能分析 0 2009-09-08 12:19 PM
concrete corrosion in partial saturated condition huangyhg 产品功能分析 0 2009-09-08 11:54 AM
chapter 4 preliminary design properties of concrete huangyhg 产品功能分析 0 2009-09-07 11:23 PM


所有的时间均为北京时间。 现在的时间是 04:30 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多