默认 drilled pier ties

drilled pier ties
i'm working in a 4 story concrete building. the foundation is drilled piers, the seismic category is b, i check the asce 7-05 and ibc 06 to check if the piers needed to be connected by tie beams, ibc section 1808.2.5 stability. piers shall be braced to provide lateral stability in all directions. ibc section 1808.2.23.1 seismic design category c, which says that you need to interconnect piers by ties, but this is for seismic category c, they do not have anything for seismic category b.
we will have a slab on grade at first level, which i tought the slab on grade will brace the pier.
does anyone has dealt with this before.
we have done this, although the slab still needs to be able to take some axial load to stabilize the pier. i would still use the percent of axial to design horizontal "wall" elements .
i typically provide grade beams to tie all drilled piers that transfer base shear (wind, seismic) to the soil, analyzing piers + gb's as moment frames including the lateral soil springs along the shaft of the piers. for drilled piers that only support gravity loads, i usually don't provide grade beams, though i check the shaft (modelled with the lateral soil springs) and provide sufficient rebar to take the moment due to 3" of eccentricty to account for a pier located off center line. the geotech engineer provides the soil stifness values based on the borings.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
drilled pier spacing huangyhg 产品功能分析 0 2009-09-08 07:45 PM
drilled pier shareware huangyhg 产品功能分析 0 2009-09-08 07:45 PM
drilled pier reinforcing huangyhg 产品功能分析 0 2009-09-08 07:44 PM
drilled pier boundry conditions huangyhg 产品功能分析 0 2009-09-08 07:43 PM
circular tie details for drilled piers huangyhg 产品功能分析 0 2009-09-07 11:48 PM


所有的时间均为北京时间。 现在的时间是 08:01 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多