几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-08, 06:36 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 diaphragm chord force transfer

diaphragm chord force transfer
i鈥檝e got a 520鈥?x 270鈥?warehouse with cmu shear walls only on the sides (spaced 520鈥?apart). all roof framing members span front to back (with intermediate beams). the back of the building is continuous cmu but the front of the building is mostly storefront and has several offsets (as large as three feet). consider wind blowing at the back of the building, what is the customary way to transfer diaphragm chord forces across the front of the building at the offsets? do i ignore this? do i add diagonals at the offsets? do a add members parallel to the back wall that "span across" the offsets?
check out our whitepaper library.
assuming that i understand the roof diaphragm geometry, and that you are talking about a plywood roof diaphragm, maybe it would be easy to just run a row of solid 4x blocking and a simpson cs continuous coil strap across over the roof sheathing. a cmst12 is good for 9.235 kips. only comes in 40' lengths, so you would have to lap. i generally specify a tight nail spacing at ends and laps, with a larger nail spacing in the field. i don't know why you couldn't have two or more rows of blocks and straps if needed. what i like about this solution is that the chord is at the diaphragm level where it belongs, not down at the bottom of roof framing level.
regards,
jim emanuel, s.e.
have you considered the possible need for an expansion joint in the 520 foot length?
regarding the offsets, if the outer most member is discontinuous (at offsets) then use the 1st continuous member across all offsets as the chord. the
i have had a similiar problem.
i set a row of columns just inside the offsets, and ran joists between the columns. the joists were set on a cap plate to the column so that their ends were only seperated by a small gap, then anlges ( with vertical leg turned down)were welded accross the gap to the top chords of adjacent joist shoes. this made a continous chord.
i used a joist loading diagraphm to give the joist supplier the necessary chord forces he needed to design the joists for.
thanks everybody. just to clarify - the roof is steel beam, bar joist and metal deck. and i do have an expansion joint.
if you don't have a continuous chord member behind the offsets, i would add angles between the joists to create a continuous chord.
daveatkins
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
chord force in a concrete filled diaphragm huangyhg 产品功能分析 0 2009-09-07 11:37 PM
chord force adjacent to cmu wall huangyhg 产品功能分析 0 2009-09-07 11:37 PM
c.k.wang intermediate structural analysis huangyhg 产品功能分析 0 2009-09-07 05:58 PM
bond beam as diaphragm chord huangyhg 产品功能分析 0 2009-09-07 04:18 PM
air force engineer huangyhg 精密机械 0 2009-09-05 10:16 PM


所有的时间均为北京时间。 现在的时间是 10:04 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多