默认 design for cost estimationbidding

design for cost estimation/bidding
when trying to obtain material quantity of say a 5-10 storey reinforced concrete building, how thorough would your design be? how long do you spend? how close would your rebar and concrete quantity be to that of the final design? again, this is for cost estimation/bidding purposes only.
clansman
if a builder has built a house for a man and has not made his work sound, and the house which he has built has fallen down and so caused the death of the householder, that builder shall be put to death." code of hammurabi, c.2040 b.c.fff">
use price per square foot for buildings built recently and similar in scope.
there is a big difference between cost estimating and bidding.
cost estimating may be used for different things:
1) to justify a project
2) to select a type of system
3) to select a contractor to work with
hard bidding is normally used to select a contractor out of several based upon complete contract documents.
what is the purpose of your documents? will there be time given to refine the design? is the bid just an estimate or a firm price?
preliminary drawings for cost estimating and bidding can become a huge problem. a contractor can not bid that which he can not see. i have had situations where the preliminaries were used for budgets by a cm and we (the ae) were blamed for the costs increases for items on the final drawings. on another occasion the added items or refined details of the finals became extra costs over the gmp.
i have had cm's state they can gmp a project based on 35% drawings. but in reality they budgeted, guessed and delayed until they had 100% drawings.
the best course of action is to make sure all parties are aware and have the same expectations. the designer is always, always the fall guy when it comes to contractors and costs. cya
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
design build huangyhg 产品功能分析 0 2009-09-08 05:13 PM
contract issues - structural steel connection design in the huangyhg 产品功能分析 0 2009-09-08 01:40 PM
calculations personal tool or public record huangyhg 产品功能分析 0 2009-09-07 10:10 PM
anchor bolt design using aci 349 appendix b huangyhg 产品功能分析 0 2009-09-07 11:44 AM
【转帖】decimal dimensioningfractional equivalents yang686526 American standards 0 2009-04-29 07:28 PM


所有的时间均为北京时间。 现在的时间是 03:59 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多