几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-08, 09:24 AM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 clerestory - tension only bracing

clerestory - tension only bracing
greetings,
i have a project that has a clerestory roof (a high roof) which looks like this:
|-------------|
| high roof |
-------- ----------
it has a metal deck with rigid insulation, no concrete. it is located in sdc "d". is there any provision in the code (ibc 2003/asce 7-02) that will allow me to use tension only bracing to bring the forces down to the lower diaphragm instead of designing a scbf or smf. i have shear walls + steel beams framing this building below the high roof.
any help is appeciated.
thanks
are knee braces allowed in seismic design? particularly in sdc "d".
any possibility of continuing four steel columns up from the steel framing below to take the lateral in cantilever action?
i don't know why knee braces couldn't be used, but, if you have room for diagonal knee braces, why not just use small shearwalls? seems like the site obstruction issue would still be there with the knee braces anyway.
mike mccann
mmc engineering
the roof is about 14' high, which would be the length of my cantilever. are there any other suggestions?
thanks
3 dimensional tube steel moment frame, pinned at the base?
mike mccann
mmc engineering
i do not thick tube steel moment frame is good option. r factor is very low (r=1.5 for tube) and it is super hard to have approved moment connection per current code for tube.
wide flange is first choice if considering moment frame i believe.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
can prestress wires in pc. pile sustained tension in pier huangyhg 产品功能分析 0 2009-09-07 10:23 PM
bracing in a freezer building huangyhg 产品功能分析 0 2009-09-07 04:43 PM
bottom chord bracing for cold form trusses huangyhg 产品功能分析 0 2009-09-07 04:28 PM
beam continuous bracing by grating attachmen huangyhg 产品功能分析 0 2009-09-07 02:49 PM
axial tension in a post-tensioned member huangyhg 产品功能分析 0 2009-09-07 02:06 PM


所有的时间均为北京时间。 现在的时间是 04:15 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多