默认 bridge basics

bridge basics
hi guys, i need some basic info on bridge construction!
what is the construction process of a simple beam bridge?? mainly looking at the in situ concrete works
thanks in advanced
holy moley. you asked a very broad question here. kind of like wanting to know the "basic" steps involved in becoming an engineer.
ok, we'll try to be constructive. here are the very "basics".
step 1. perform topographic survey of site. depending upon the posted speed of the road, you'll want to extend the survey several hundred feet up and downstation of the crossing itself. also if a stream is being crossed, the survey should extend several hundred feet upstream and downstream.
step 2. perform a bridge type, size and location study. this establishes basic bridge geometry, hydraulic constraints, geotechnical constraints, relationship to navd88 datum and horizontal control to established coordinates, archeological and historical constraints, comparison of structure types, spans orientation and locations relating to technical and economic issues.
step 3. develop preliminary plans of the selected structure type. determine environmental and hydraulic impacts based on selected structure.
step 4. develop right-of-way plans, legal team to initiate land condemnation documents.
step 5. develop environmental permitting documents for federal, state and municipal agencies.
step 6. prepare final design documents for construction (ie. plans, specifications and quantity/cost estimate).
step 7. develop construction administration bid documents.
step 8. bid project. select contractor.
step 9. contractor contacts dig safe.
step 10. contractor stakes out bridge, establishes erosion control limits.
step 11. contractor excavates, installs foundations, installs superstructure, barrier membrane, wearing surface, bridge rail, approach rail, etc.
ok...i'm not going to get too crazy here....i think this provides a brief overview, but please know that it nowhere near covers all the tasks involved in bridge design and construction. consider this an bullet list for the next book on "bridge construction for dummies".
there is a "bridge engineering" group in engineering tips that might offer some assistance, although you will probably need to be much more specific about what information you are seeking if you expect to receive meaningful responses.
hope this has been helpful.
a tall order. lobstaeata, a valiant effort (and patient).
i would suggest some reading or standards review. you can look up the aci site and 'get a feel for some bridges' by
examining concrete international. in canada, we have the "canadian highway bridge design code" (can/csa-s6-06).
a basic or as you state 'simple' bridge is relatively easy from a structural aspect, it is all the other (hydraulics etc) procedures, as lobstaeata states, that makes it more involved. look at a set of plans of a culvert or small bridge (pick up a tender set for example) and you will appreciate all the engineering. a lot to absorb.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
bridge abutment design huangyhg 产品功能分析 0 2009-09-07 05:02 PM
basic masonry bridge building in developing countries huangyhg 产品功能分析 0 2009-09-07 02:39 PM
arema rating steel bridge load combinations huangyhg 产品功能分析 0 2009-09-07 12:50 PM
aashto bridge design huangyhg 产品功能分析 0 2009-09-07 09:20 AM
1865 bridge photo huangyhg 产品功能分析 0 2009-09-06 10:36 PM


所有的时间均为北京时间。 现在的时间是 02:43 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多