几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-07, 03:46 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 big dig designers asked to reduce bolts

big dig designers asked to reduce bolts
a new enr news clip on the big dig fiasco. apparently, someone coerced the designers to reduce the number of the bolts in the connections from 4 to 2. but i know i saw the photos of the plates with 4 epoxy bolts hanging out so i don't understand this story:
reminds me of the hyatt-regency. connection...contractor submittal...
from the story:
"unless i'm missing something, i don't see why (the ceiling designer) requires a 4 bolt anchor plate when a 2 bolt anchor plate would be sufficient," robert richard of bechtel/parsons brinckerhoff wrote.
richard's memo, dated june 23, 1998 and addressed to gary baxter, also of bechtel/parsons brinckerhoff, said gannett fleming should either cut the number of bolts in half or submit calculations "proving that 2 anchor bolts do not work," the newspaper reported.
gannett fleming officials agreed to reduce the number of bolts, calculating that the ceiling would be safe "assuming proper installation and quality of the product materials," according to a company statement."
ok, so it looks like calculations were submitted proving that two bolts would work. what's the problem?
bechtel/pb and gannett-fleming aren't rookies and don't hire people who are intimidated by much of anything (it's the other way around, in my experience). if there's money to be made, they make it and if a real savings - without compromising safety - could be realized, then they are 100% within their right to make it happen.
let's see the calcs and not let the boston globe tell us our business.
be that as it may, if this turns out to really be something akin to the hyatt-regency, then their heads should roll.
no...my confusion was that all the photos i saw in the news showed plates with four bolts. here they are saying that they reduced the actual construction to two bolts.
somwhere in this forum there is a long thread on this topic with lots of links. my recollection is that there was a 20 ft tee holding the panels. near the ends of the tees were rods going straight up to a connection that had 2 ceiling bolts each. the center had one vertical and two diagonal connecting rods. this conetion had four bolts. i think they were talking about the ends.
my problem with the design is that it is difficult to install epoxy anchors overhead and acheive reliable repeatable results. my other problem is that the five points of connection all had turnbuckles, making it impossible to determine how much load was in each connection.
a very intersting topic to follow.
jae-
jmiec - i actually remmeber a photo where there were not only 4 holes, but 4 bolts hanging out of them. maybe in some cases there were two. i guess i'll keep watching the news and photos. eventually i suppose there will be a report out on the failure.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
big dig boston ceiling collapse huangyhg 产品功能分析 0 2009-09-07 03:46 PM
big dig arrests huangyhg 产品功能分析 0 2009-09-07 03:45 PM
bending a307 anchor bolts huangyhg 产品功能分析 0 2009-09-07 03:24 PM
base plate over misaligned anchor bolts huangyhg 产品功能分析 0 2009-09-07 02:26 PM
anchor bolts too shor huangyhg 产品功能分析 0 2009-09-07 11:53 AM


所有的时间均为北京时间。 现在的时间是 01:32 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多