几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-15, 02:27 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 precast tts

precast tt's
this is about reinforcement in twin t's
first, is the web steel based on a deep beam member?
second, are the flange members considered continous over the stems? or are they cantilevered off of the stems. this is considering that they have vector connectors every 4'-0".
i ask this because many differing designs have come accross my desk and i want a general opinion of others.
thanks
i'm not sure what you mean by your first question??
in lightly loaded double tees, you can actually get away with some very minimal web reinforcing at each end, as per a report done in the pci journal.
i would consider the flange to be continuous over the double tee legs, but not across a flange to flange joint.
i'm not sure how helpful this has been, but if you could expand on your questions maybe i can give you more input.
karlt
i am just curious how to determine what is required by code. i did see that article. i am estimating a job and just curious if any "quick" way is available.
usually the spans are out of the deep member range or i wouldn't be using a double t
i agree with haynewp - you only need to consider the member as a "deep" member for shear if the clear span is less than or equal to twice the member depth, which for say a typical 24" deep dt would result in a 4'-0" long member.
i believe the pci handbook has a design example for sizing the steel in the double tee deck.
there are also numerous prestressed design programs such as concise beam, or lec press that can give you an answer really quickly.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
precast pile connection to pile cap huangyhg 产品功能分析 0 2009-09-15 02:22 PM
precast parking garage questions huangyhg 产品功能分析 0 2009-09-15 02:21 PM
precast drawing liability huangyhg 产品功能分析 0 2009-09-15 02:18 PM
precast concrete panels in saltwater huangyhg 产品功能分析 0 2009-09-15 02:15 PM
mix proportion of cast-stone vs. precast concrete huangyhg 产品功能分析 0 2009-09-10 02:27 PM


所有的时间均为北京时间。 现在的时间是 12:33 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多