几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-09, 05:52 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 how to preventminimize wind moments from reaching the footi

how to prevent/minimize wind moments from reaching the footi
i have a problem with a footer design. there is a wind moment of about 10000.00 lbf-ft coming from an isolated column (connected to flexible wood frame shallow truss). i do not want the moment transferred to the footer because then the footer size becomes substantial. is there a way of
accomplishing this ?
i noticed that some light standards(structural tubes or pipe columns about 30 ' to 40 ' high,cantilevers) are supported by a plate. the plate will have typically 4 - 1/2" to 5/8"
anchor bolts that descend into the pier. there is an air space of about 4" to 5" between the bottom of the plate and the top of the pier. i wondered why ! is this arrangement to stop moment from going down to the pier/footer ?
i will appreciate very much if someone could enlighten/help me on this. a technical reference or actual design example will be very helpful. thanking you in advance.
check out our whitepaper library.
the air space between the column/pole base plate and the top of a concrete pier is not to avoid moment. you cannot avoid moment in the pier that way.
if the isolated column is the only structural element that is resisting the lateral wind coming in from the truss above, the only way to prevent this is to provide some other load path for the wind to get down to the foundation without bending the column. this is usually done by providing lateral bracing (such as x bracing) between two columns. this re-directs the lateral force at the roof (or whatever level the truss is at) to the lower level using axial loads in the braces. at the foundation, you then have vertical and horizontal forces at the top of the pier/foundation to deal with - and not a moment in the pier.
this is pretty basic structural design. i would suggest you meet with someone personally who can further assist you directly.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
glazing in non-windbourne debris areas huangyhg 产品功能分析 0 2009-09-09 02:42 PM
effective wind area huangyhg 产品功能分析 0 2009-09-08 09:45 PM
british wind loading codes huangyhg 产品功能分析 0 2009-09-07 05:19 PM
balcony guardrail wind huangyhg 产品功能分析 0 2009-09-07 02:11 PM
asce figure 6-10 wind loads huangyhg 产品功能分析 0 2009-09-07 01:22 PM


所有的时间均为北京时间。 现在的时间是 12:47 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多