pemb spread footings
i'm working on the foundation design for a 130' span pemb with 30' bay spacings. allowable bearing capacity = 4 ksf. at column line a the columns are 4' above finished grade and at column line b the columns are 13' above finished grade. bottom of footings are 5' below grade. the max. "thrust" force for such a building is 68 kips, which i received from a pemb builder. there is an interior retaining wall 14' from column line b, which forms a trailer bay. i want to design the footings to resist the moment but the moment is so great at column line b that my footing is becoming too large. i have thought about a tie beam at the base of the footing to the retaining wall and also about using a combined footing. the combined footing also seems to turn out to be rather large.
i would appreciate any tips on how to go about reducing the footing size i currently have.
check out our whitepaper library.
ma'af - what is pemb? not run into this term before.
pemb = pre-engineered metal building
if i understand you correctly, you have pinned pemb column bases supported above adjacent grade by a concrete column or wall, which would be fixed at its base. the horizontal thrust * the 13' above grade is the moment you are having to resist, right?
i think the tie beam is the best solution. are drilled piers an option? if so, you might could design it as more of an embedded pole-type foundation.
taro - thanks; otherwise i would have swagfff">ged it.
our firm just finished a church project with a similar condition to what you are describing--and what a hassle!!! is there any way you can talk the preengineered metal building manufacturer into extending his columns at grid line b down to grade?
if not, the tie beam is obviously the best answer, but can you span it across the trailer bay? is there a headroom issue? or an interference issue?
daveatkins
be aware that pemb's are typically designed assuming that the foundations do not deflect. a pier supporting a pemb column may have significant deflection that will have a weakening affect on the steel frame.
i like daveatkins suggestion.
thanks for the responses.
drilled piers are not an option here. i'm going to talk with the pemb manufacturer to see if the column can be extended down to grade. if this is not a possibility than i will go with the tie beam. unfortunately, there are headroom issues in the trailer bay so i will have to keep the tie beam at the footing level. i will also have to talk with the pemb manufacturer about allowable deflections in the pier supporting the column.
i'll post the answers i get. thanks again!
a tie beam at the footing level won't do much good. if you can't make the preengineered metal building manufacturer change his design, and you can't have a tie beam across the trailer bay, then you will need to design a large pier with a large rectangular footing to resist the loads. or perhaps the entire wall along grid line b can have a retaining wall-like footing under it.
daveatkins
srbu,
we recently designed the foundations for a pemb where the client wanted a dirt floor w/o tie beams. fortunately there was was an inner wall parallel to the foundation. we tied the two together, using the conbined weight and soil between to resist sliding and overturning. the span was a little greater than yours but we were nearly at grade. can you tie to the truck bay walls and extend them a little deeper to get the resistance that you need? if not i would look at drooping tie beams under the truck bay.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
pemb net uplift and thickened slab footings huangyhg 产品功能分析 0 2009-09-15 12:01 PM
load redistribution on a line of footings supporting continu huangyhg 产品功能分析 0 2009-09-10 11:10 AM
honeycomb in concrete footings huangyhg 产品功能分析 0 2009-09-09 04:53 PM
development of flexural reinforcement in footings and pile c huangyhg 产品功能分析 0 2009-09-08 06:31 PM
design build pemb foundations huangyhg 产品功能分析 0 2009-09-08 05:13 PM


所有的时间均为北京时间。 现在的时间是 06:10 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多