默认 detailing rebars in pour strips

detailing rebars in pour strips
typically rebars are spliced in the pour strips in suspended slabs. if rebars are not spliced, i.e. continuous, and the concrete is poured after 28 days from pouring the adjacent panels, is that any helpful for releasing shrinkage stress?
thanks for the input.

check out our whitepaper library.
yes the shrinkage stress in the second placement is lessened by the % of the dimension already placed compared to the overall dimension.
civilperson,
thanks for the input. i did not understand from you if the rebars being continued across the pour strip vs. being lap spliced will affect the purpose of the pour strip.

continuous bars and properly lapped bars are treated the same in slab design, so there would be not difference in your case.
while delay between pours is beneficial in controlling shrinkage in the longitudinal direction, in the opposite direction, shrinkage of the second pour will be restrained by the first pour and will likely result in some restraint cracking.
yes, the pour strip will be poured 28 days after the adjacent panels are poured. now, is it ok to make the rebars continuous through the delayed strip? to me this delaying is only a waste of time and is only serving similarly as the saw cuts; controlling where the cracks to happen. i could not convince the boss here that rebars must be lap spliced in the pour strip.
ailmar,
i am sorry, i didn't fully understand your question at first. i thought you were comparing placing the slab with just constructions joints with continuous reinforcing vs. with delayed pour strips with lapped bars. now i see you are talking about using pour strips, but with continuous bars.
certainly the continuous bars would provide some restraint to the second pour, while lapped bars would not. so the second slab would tend to crack more. how much more and whether the cracking is important would be dependent on the structure.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
detailing for uplift in high wind area huangyhg 产品功能分析 0 2009-09-08 06:19 PM
detailing at columnbeam intersection huangyhg 产品功能分析 0 2009-09-08 06:19 PM
concrete column detailing huangyhg 产品功能分析 0 2009-09-08 11:49 AM


所有的时间均为北京时间。 现在的时间是 07:12 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多