几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 仿射空间:CAX软件开发(三)二次开发与程序设计 » CAD二次开发 » SolidWorks二次开发
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-04-13, 10:22 AM   #1
yang686526
高级会员
 
注册日期: 06-11
帖子: 14579
精华: 1
现金: 224494 标准币
资产: 234494 标准币
yang686526 向着好的方向发展
默认 【转帖】dimensioning in detail views

dimensioning in detail views ...
i did a quick search on this in faqs but don't know what to call it, so didnt find anything. my situation is that i am trying to dimension in a detail view to a centerline in the parent of the detail view, but that centerline is not in the detail view (it cant be due to the magnification required). i think i've done this before (or confusing with something similar) so i think it can be done, but just cant for the life of me remember the steps.
anything anyone?
thanks
find a job or post a job opening
you can go to view and turn on either temporary axis or coordinate systems and then you will be able to dimension to them. you will have to go in and modify the dimension to hide the one set of extension lines. hope that helps.
try first making the boder of your detail view large enough to get all the entities you are dimensioning, then reduce the size of your detail border. change scale as needed.
yeah i guess thats a more efficient way to do it. never thought of it though.
i like the input, but unless i am thinking something different, maybe with ordinate, there was way of doing it that was not as a "work-around", more direct and accomplished through sw functionality. maybe it was ordinate, for dimensioning off zero ... i could be all wet on this though. thanks again, looks like your way will work, but i am stubborn ...
you could use a model dimension from a sketch. you are looking to create a foreshortened dimension.
1)add the desired dimension to a sketch in the model.
2)add a temporary view to the drawing.
3)add the dimensions of the sketch to the temp view.
4)shift + select the dimension you want to add to the detail view and drag the dim into the detail.
yang686526离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
【转帖】automatically update views yang686526 SolidWorks二次开发 0 2009-04-13 09:11 AM
【转帖】auto insert 3 standard views yang686526 SolidWorks二次开发 0 2009-04-13 09:09 AM
【转帖】api - repositioning detail view yang686526 SolidWorks二次开发 0 2009-04-13 08:55 AM
【转帖】how to make a tool which checks that all the views are linked to bom are no yang686526 SolidWorks二次开发 0 2009-04-12 09:21 PM
【转帖】how to make a tool which checks that all the views are linked to bom are no yang686526 SolidWorks二次开发 0 2009-04-12 06:37 PM


所有的时间均为北京时间。 现在的时间是 12:55 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多