几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-16, 07:33 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 weight of crane on concrete slab

weight of crane on concrete slab
anybody know a site where i can have an idea on how to calculate the best way to distribute the weight of a 150 ton crane on a concrete slab.
check out our whitepaper library.
slab on grade? crawler crane or wheeled crane? i suppose that this is too easy but what about crane mats? wheeled crane may take a little more cribbing due to the small out-rigger area.
it's a wheeled crane with outriggers, anf for which, i'll probably have to have several supports beneath the slab directly under the outriggers. this is what i have to calculate (my first time!)
the first thing you need to do is to contact the company who is hiring you their crane to ask if they have crane mats to place beneath the outriggers. these are generally timber mats of differing sizes which will re-distribute the outrigger load across their area. you also need to be sure that you have their published maximum outrigger loads for all orientations of the jib.
you then need to check the bearing stress between the crane mat and the concrete slab. if you do not have mats then take the load over the area of the outrigger foot and compare this with the bearing capacity of your concrete. if the concrete fais you need a larger mat. following this check, you then distribute the load from the edge of the mat/ outrigger pad at a gradient of 1:1 through the depth of the concrete slab (in both directions when viewed on plan) and check the bearing capacity of the subgrade over this larger footprint at the slab/subgrade interface. if you have not exceeded the safe bearing capacity of your subgrade then all is well and you can proceed with the lift.
please check that there are no known voids below the slab in the area. if there are then you will have to check the bending/shear capacity of the slab to span these troublesome areas. if you are working in the uk you should have a delegated named person who is the "lift/crane coordinator" who will need to have all of this info in his posession and check your specified requirements prior to the lift taking place.
regards
andy machon


civeng,
do not forget settlement calculations. u do not want to end up in a scenario where one of the pad is settling. remember instances where u will have more forces on one pad compared to the other.
riz
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
shoring concrete floor system huangyhg 产品功能分析 0 2009-09-15 10:21 PM
how to thicken an existing concrete slab on grade huangyhg 产品功能分析 0 2009-09-09 05:54 PM
crack in old floor slab huangyhg 产品功能分析 0 2009-09-08 02:20 PM
concrete roof slab load huangyhg 产品功能分析 0 2009-09-08 12:34 PM
chapter 4 preliminary design properties of concrete huangyhg 产品功能分析 0 2009-09-07 11:23 PM


所有的时间均为北京时间。 现在的时间是 07:18 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多