几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-15, 08:38 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 seismic ch12 weigh

seismic ch12 weight
is there not an inherent contradiction within asce 7 in that to calculate elfs you use a seismic weight with only 25% of ll but then when you combine load factors you use up to 0.75ll for allowable stress design. so you are combining elfs based on 0.25ll with gravity loads of 0.75ll?
check out our whitepaper library.
the tributary area of gravity loads can be completely different from that of lateral loads on any given structural element. the ll is mainly load type not same exact load.
regards,
m.s. genidy, pe
structural soft, llc
thanks for the response but i am not with you. you have a load case which includes 75% of ll as part of the gravity loads as well as earthquake loads. now the equivalent lateral forces you work out for the earthquake loads are dependent on the gravity loads on the structure but to calculate the earthquake loads we use only 25% of ll.
you only use 25% of the ll in storage areas - generally you don't have to include any of the live load.

i think structuralca was trying to say that a lateral resisting element will be receiving lateral load from a large tributary area, which can safely be assumed to carry a reduced live load. but the gravity live load in the area immediately around the element could be the full live load.
daveatkins
couldn't this be an allowance for the potential sloshing of live loads during a quake? boxes, books and files will shift and not necessarily impart a load in time with the fixed structure. any of this live load due to people will definitely not shift in time with the structure.
a 3'-0" tall stack of paper would shift all over the place.
the 25% factor is used whenever the live load exceeds 100 psf, whatever the type.
also, whenever the snow load exceeds 30 psf, then a 25% factor, or whatever the local building official dictates, is added.
mike mccann
mmc engineering
i think i have it now after a bit more research and looking around. teguci's explanation seems the most feasible. only things firmly attached to the structure will move with it and contribute to the seismic weight.
daveatkins and structuralca, i see what you were trying to say and that might be the case for designing individual
msquared48 - what code are you referring to? per asce 7-05 its just 25% of storage ll...
you can also get loads over 100 psf from computer floors and equipment, plus heavy equipment loads from manufacturing that are not associated with storage, to include overhead crane loads. gridiron loads in stage assemblies too.
mike mccann
mmc engineering
i don't disagree - i'm just wondering where you are finding the "over 100psf" designation in the code.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
pile cap included in seismic weigh huangyhg 产品功能分析 0 2009-09-15 12:20 PM
ibc vs. aisc seismic - revisited huangyhg 产品功能分析 0 2009-09-09 06:57 PM
ibc effective seismic weigh huangyhg 产品功能分析 0 2009-09-09 06:48 PM
ibc 2000 seismic forces - whatis component operating weigh huangyhg 产品功能分析 0 2009-09-09 06:40 PM
ibc 2000 - seismic-force-resisting system huangyhg 产品功能分析 0 2009-09-09 06:38 PM


所有的时间均为北京时间。 现在的时间是 06:34 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多