几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-15, 01:41 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 post tension newbie

post tension newbie
hi folks,
i'm doing some post tension design for the first time and i have a question about something that a coworker mentioned to me. according to our notes and specs, we basically provide the effective tensile load required for the beam to operate. losses, anchorages and other items are for the manufacturer to check and design. in addition to the pt design, i have been instructed to design the beam to include enough mild steel (bonded) for a special condition which includes the dead load and 25% of the live load. this will allow the beam to act like a regular (non-pt) beam and support itself if something should happen to the cables. i have searched through the codes, but have not yet found a reference to this requirement. could someone please let me know if you are familiar with this stipulation? i am having to add a lot of mild steel and i believe i will need to do some additional calcs to make sure the beam is still acceptable. thanks in advance for any help or advice you can offer.
hi bevo98,
i have not heard of such a method when designing post-tensioned. post-tensioning, prestresses a beam and no amount of mild reinforcing for a given depth of beam can measure up to such a post-tensioned capacity.
i don't know what industry you are in, but from my experience i have had to design all my prestressed or cast-in-place post-tensioned
the 100% dead + 25% live requirement was a modification to aci-318 by the uniform building code. see 1997 ubc section 1918.9.2.2. it is not required by the international building code.
bam!!!
now that's some good information.
thanks taro
my p-t background is in bridges, my apologies for not being helpful.
regards
vod
vod - nothing to apologize about - eng-tips runs on enthusiasm and participation. appreciate all your posts.
thanks.
vod
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
multi span cable huangyhg 产品功能分析 0 2009-09-10 03:25 PM
encapsulated post tension anchorages huangyhg 产品功能分析 0 2009-09-08 10:16 PM
elongation of post tension cables huangyhg 产品功能分析 0 2009-09-08 10:07 PM
deck-railing post connection huangyhg 产品功能分析 0 2009-09-08 04:37 PM
axial tension in a post-tensioned member huangyhg 产品功能分析 0 2009-09-07 02:06 PM


所有的时间均为北京时间。 现在的时间是 03:36 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多