几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-10, 01:21 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 maximum moment at construction join

maximum moment at construction joint
this is a question ive always had in my mind with reinforced concrete design. sometimes the maximum frame moment accurs at a construction joint simply because of construction technique e.g. footing to retaining wall joint, column to slab joint, or beam to column joint.
is the joint especially designed taking in account the weakness inherent in the joint? or designed as if it cast monothically. incidently how about the design of connections in rc concrete.
i'd love to hear any comments/ thoughts amongst designing engineers.
thanks !

it depends on what forces are going through the joint. but generally, joints in concrete don't matter that much. with reinforcing going through the joint, usually you have enough strength to deal with any shear or orthogonal stresses.
thanks jae
if a contractor asked your permission to form a construction joint in a suspended slab close to the maximum moment would you permit him ?
thanks !
yes - do so all the time. i avoid cj's at points of high shear and try to place them near midspan....or within the middle third of the span.
i disagree with jae somewhat on this, or at least with my interpretation of his statement that "generally, joints in concrete don't matter that much". i think that direct shear on a joint should always be considered. for instance, you would not cast a column above a floor slab soffit before casting the slab unless there were a seat on the column for the slab.
civeng80, construction joints in suspended slabs are best made where the moment is large and the shear is small. so about centre span is best.
yep - good point.
thanks
especially hokie66 always very accurate comments!
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
construction join huangyhg 产品功能分析 0 2009-09-08 01:27 PM
cantilever steel beam at column huangyhg 产品功能分析 0 2009-09-07 10:40 PM
beams shear splices vs. moment splices huangyhg 产品功能分析 0 2009-09-07 03:13 PM
aisc 13th ed. and cjp dw moment connections huangyhg 产品功能分析 0 2009-09-07 10:27 AM
【转帖】asme美国机械工程师标准目录2 huangyhg American standards 5 2009-04-26 02:38 PM


所有的时间均为北京时间。 现在的时间是 04:04 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多