masonry lap splices
hello all, i have an existing masonry block wall that i am looking to extend up. it is a site retaining wall and i would like to extend the reinforcing up into block that i am extending. the existing wall is reinforced with #6 bars at 24" oc. i have gone to the site and can see the grouted cores and the bond beam is 3 block courses down.
i need a lap splice of 36", but with the bond beam 24" down i cannot get that. i could used mechanical connectors but then i would need to demo into the grouted cells to expose the existing rebar, potentially splitting the block. my boss suggested that we could put bars into the cores on either side. the theory being that two bars lapped 24" is equivalent to one bar lapped at 36". is that a credible idea? code only gives lapped, welded or mechanical connectors.
tia
roland bokma
structural e.i.t.
progressiveae
how do you get rebar lap if you put the new bars in the adjacent cores? rebar lap requirements, in my experiance, mean rebar contact over the length of the lap.
my suggestion would be to put the new rebar in adjacent cores as you suggest, grout those cores, run the new rebar up into the new block and the first new course of block should be a bond beam. this doesn't really lap the rebar, but it would lock it into the existing wall. the new bond beam would provide additional stiffness and bond for the new rebar. the new bond beam would have horizontal rebar too.
code permits noncontact lap splices to occur in the adjacent core providing they are not spaced further than 1/5th the required lap length nor more than 8 inches (aci 530-99, section 2.1.8.6.1.2).
thanks for the response, roland
rolin, you can also reduce the required lap splice (development length) based on area required/area provided - so having extra rebar does allow a diminished length.
jae,
wouldn't the reduction in lap length for excess area only apply if the rebar at both ends of the lap joint has excess area? ie not only do you need the new bars to have excess area, but the existing bar as well??
whislt concentrating on the lap/splice detail don't forget to check the overall design of the new "higher" wall, especially for the lower section of wall which will be subject to greater forces and moments at the the base....then it was originally designed for.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
masonry cemen huangyhg 产品功能分析 0 2009-09-10 12:28 PM
in enercalc masonry wall design, what is parapet heigh huangyhg 产品功能分析 0 2009-09-09 07:17 PM
ibc 2107.2.3 vs. aci 530 2.1.8.6.1.1 masonry lap length cage huangyhg 产品功能分析 0 2009-09-09 06:46 PM
another thread on lap splice length in cmu huangyhg 产品功能分析 0 2009-09-07 12:17 PM
aci 318-05 class b tension lap splices huangyhg 产品功能分析 0 2009-09-07 09:46 AM


所有的时间均为北京时间。 现在的时间是 03:51 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多