几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-09, 06:49 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 ibc handrail extentions for industial stairs

ibc handrail extentions for industial stairs ?????
hey brothers and sisters,
i have a question regarding the handrail extentions called out in the ibc 2003 1009.11.5
i'm a structural engineer working for the contactor in this case, and the design engineer is insisting on these 2 ft handrail extentions in an purely industrial building. these extentions are not practical, yet there are no exceptions in the code.
osha does not require these extentions in there "fixed industrial stair spec".
since i am not a member of icc i can not get a code interpratation, you got to pay for that.
anybody out there run into this?
also i'd like some clarification on the 7" riser and 11" tread requirement, again there is no exception for industrial, yet osha has a range for riser and tread dimensions way outside this.
it seems common sense to me, ibc needs to add these excepetions. these requirment are clearly not intended to industial, platforms, catwalks and the like, but for "means of egress" only
find a job or post a job opening
if your building is an industrial type facility in where the public has no access, you can use osha to design your stairs. the rise/run criteria is a lot looser as well as the guardrail spacing requirements. just be sure that your building official knows that you are not designing using the ibc.
both the top and botttom handrail extensions and the 7" max riser / 11" min tread are required for ibc industrial stairs. the extensions are 12" horizontal at the top and sloped (same as stair) for one projected tread depth (i.e. 11" or more) the bottom. your best bet is as minorchord proposes. check with your code official to see if you can get by with using only ohsa and not using ibc.
notice first off that chapter 10 of ibc is dealing entirely with egress from buildings. if your stair falls under this classification, and ibc design is required, then you're stuck. but if your stair is not used for egress from buildings, then this entire chapter is not applicable to your case.
even so, my ibc 2003 shows a 12" extension in this section, not 2'.
thanks,
you are right it is 12" per 1009.11.5.
and i agree with your reference to "means of egress"
the part that leads to some confusion is in 1607.7.1 were they list load exeption for group f (factory and industrial) i would think they could do the same in chapter 10. but i guess, like you said it is implied because mech access stairs are not "means of egress"
thanks for the imput.
i just would like something official, because this comes up alot when you deal with professionals that have mostly commercial/residential experience.
i also had a local plan reviewer flag the same thing on a mechanical access platform. he even quoted the ibc chapter 10.
under ibc equipment platforms and the components that access them are basically considered part of the equipment. therefore, the components that access the equipment platform are non-means of egress. refer to section 505.5 of ibc. thus, anything such as a ohsa stair, a ladder or alternting tread stair can be used to access the equipment platform.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
ibc 2107.2.3 vs. aci 530 2.1.8.6.1.1 masonry lap length cage huangyhg 产品功能分析 0 2009-09-09 06:46 PM
ibc osha stairs huangyhg 产品功能分析 0 2009-09-09 06:35 PM
does a handrail provide additional support against defelctio huangyhg 产品功能分析 0 2009-09-08 07:10 PM
base shear calculation fron ibc and asce-7 huangyhg 产品功能分析 0 2009-09-07 02:29 PM
bar splices in cmu for ibc are too much huangyhg 产品功能分析 0 2009-09-07 02:19 PM


所有的时间均为北京时间。 现在的时间是 12:24 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多