几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-09, 04:57 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 horizontal construction joint in a wall at a vertical lap sp

horizontal construction joint in a wall at a vertical lap sp
i want to provide a horizontal construction joint in a wall. there is a lap splice of the reinforcement at the same height. i think that the continuity of the steel will be established whether or not the wall is placed in lifts or monolithically.
will the transfer of force between bars by bond stress be affected if i locate a horizontal construction joint in a wall where the reinforcing steel is lap spliced? is this permitted by aci? has anyone done this before?
you need to have the reinforcing fully developed on both sides of the joint.
if this is a special shearwall, you may want to read thru aci 21.5.4 for add'l development requirements.
it is in a hydraulic structure. similar to an open rectangular box. ext. wall height varies from 24' to 50'.
so, it is assumed that the reinforcement that is not fully developed above and below the construction joint cannot contribute to the strength of the wall. even partially...
you have to develop the bar for the tensile force that is required. there is an excess reinforcement factor in aci you can apply that will bring the length required down if there is excess reinforcing. i probably would go ahead and fully develop the bar.
i've never put a horiz joint in a liquid retaining structure, only vertical. i'm not sure what else you need to be careful about, make sure your shear is taken care of across the joint and also waterstops.

thank you for your opinion haynewp. i need to reassess the proposed construction proceedure.
what about putting the splice above the construction joint similar to that at the bottom of the wall?
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
hollow block wall huangyhg 产品功能分析 0 2009-09-09 04:43 PM
foundation wall 40 feet below grade huangyhg 产品功能分析 0 2009-09-09 01:38 PM
difference between a construction joint and an expansion joi huangyhg 产品功能分析 0 2009-09-08 06:40 PM
cut horizontal bars at wall construction joints huangyhg 产品功能分析 0 2009-09-08 04:17 PM
concrete tanks - vertical construction joints in walls huangyhg 产品功能分析 0 2009-09-08 12:55 PM


所有的时间均为北京时间。 现在的时间是 09:02 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多