ground supported slab level
this is not a stricly engineering problem but someone may offer some insight.
for under floor heating on a concrete ground supported slab i require 110mm of insulation to satisfy the u-value requirement.(sourse- insulation manufacturer backed up by my own calcs)
hense my ground floor build up is;
65mm screed with heating pipes on
110mm insulation on
150mm structural slab on
dpm/radon barrier.
every detail i come across in books and literature shows the base of the structural slab level with the ground outside. this means however the floor level would be 325mm above the ground outside.
traditionally a 150 step between inside and outside is formed by the structural slab (without any additional build up) in this case however a journey outside will require a parachute!!
my question; is there any consequenses of lowering the structural slab til the top is level or slightly below the ground outside? this will give a more acceptable step/ difference in level.
i propose to bring the dpm up the inside face of the wall and lap it with the dpc 150 above ground, to form a barrier.
any thoughts?
check out our whitepaper library.
in coastal south carolina (frost depth = 0 inches), structural slabs are routinely constructed with with almost all of the concrete below finish grade. however, this is based on having surrounding areas with positive drainage (typically a minimum of 1/4" fall per foot) away from the structure. the finish concrete finish elevation may be 1 or 2 inches above the adjacent grade.
putting the top of concrete at or below surrounding grade is an invitation for "trouble" (flooding during heavy rain), imho.
thanks slideruleera,
i am in ireland and flooding and frost are not uncommon.
just for future reference, what would be the causes of trouble?
is it your opinion that water may bridge the wall (which is masonry cavity wall) then find away through the damp proof mat and then penetrate the insulation and screed?
parrot77 - water is almost always the biggest problem. in many places we have sandy soils that drain well. if water can be kept out the structure during rainfall, it will be "gone" shortly after the rain stops.
if your soils are different, my comments may not apply to your location.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
ground bearing slab huangyhg 产品功能分析 0 2009-09-09 03:11 PM
floor slab curling huangyhg 产品功能分析 0 2009-09-09 12:49 PM
elevated concretesteel beam garage slab design1 huangyhg 产品功能分析 0 2009-09-08 09:59 PM
crack in old floor slab huangyhg 产品功能分析 0 2009-09-08 02:20 PM
as3600 concrete strength for slab on ground huangyhg 产品功能分析 0 2009-09-07 12:53 PM


所有的时间均为北京时间。 现在的时间是 04:47 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多