默认 cross bracing - steel and masonry

cross bracing - steel and masonry
i'm looking at a situation i don't agree with and want some second opinions. we were contracted to design a mezzanine inside a pre-engineered warehouse building and a attached office. there is a masonry wall with it's centerline hitting the back edge of their columns. they are now telling me that they want their cross bracing to attach to my masonry wall at a point right next to the column instead of directly to the column. it's an 8 kip load applied by a rod.
i explained that since we were already chipping the block around the column we might as well chip around the cross bracing also. they insist on bearing on the block and say it's my problem.
1. does this seem like the pre-engineering company trying to pawn work off onto me?
2. does anyone know of a good reference that could help explain how to desing for a situation of this nature?
i know i'l have to grout the block that i attached the connection to but i don't have any idea how to determine a lateral force in the direction of the wall.
find a job or post a job opening
i would say that the pemb designers should provide complete lateral support for their building via tension bracing. it is normal delegate the design of the pemb system by the engineer of record. they the engineer of record would design the foundations based on the reactions supplied by the pemb supplier.
to be honest, i have not seen a situation where the pemb supplier is asking the cmu designer to take the lateral load of their building unless the wall is a shear wall and is integral part of the pemb.
this is my two cents worth.
regards,
lutfi
because of other constraints, i have designed masonry shear walls for pemb. these were pseudo design build situations, so i was communicating with the pemb engineers up front. pemb engineers x-braced down to a certain elevation. pemb engineers designed the connection to the masonry wall (with my approval) and supplied loads to wall. i have never heard of pemb engineers asking the eor to use a masonry wall. unless there is a very good reason to do this, the pemb should be a stand alone system.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
cracks in masonry wall huangyhg 产品功能分析 0 2009-09-08 02:27 PM
cantilered column embedment into masonry pier huangyhg 产品功能分析 0 2009-09-07 10:34 PM
astm steel grade to support basement wall huangyhg 产品功能分析 0 2009-09-07 01:47 PM
allowable defelction for spandrel beam bracing masonry huangyhg 产品功能分析 0 2009-09-07 10:55 AM
a706 bars for masonry huangyhg 产品功能分析 0 2009-09-07 09:17 AM


所有的时间均为北京时间。 现在的时间是 11:44 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多