几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-08, 02:13 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 cost of reinforced concrete columns

cost of reinforced concrete columns
hi guys,
i have a situation where some isolated 800 x 300 reinforced concrete columns (2.5' x 1') have been offset from the gridline. there are no architectural requirements to have these columns this dimension at this particular location, so i was wondering if it would be more economical to provide a 400 x 400 (1.25' x 1.25') square column in this location if it is easier to form and build and therefore, reduce cost.
what is the contibuting factor to the cost of reinforced concrete columns, should i call up all columns the same dimension for the re-use of forms or would reducing the material used be more economical?
check out our whitepaper library.
one of the keys to economical columns is minimizing the complexity of the column ties. with a square column with only 4 vertical bars, you only need a "square" tie. if you have more bars in the column (such as 8) or if you use the rectangular 800 x 300 column, you would probably have more than 4 bars and need additional cross ties for the intermediate bars...which adds cost.
i think what you are hinting at is also true to an extent...that odd shaped rectangular column forms are more expensive than square column forms which many times are formed with standard form systems...but i think that some form systems are fairly versatile.
jae has a point with the ties, but with your example, i think the main difference in cost would be that the rectangular column is 50% bigger than the square one.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
cost of concrete and reinforcemen huangyhg 产品功能分析 0 2009-09-08 02:13 PM
concrete sampling guidlines huangyhg 产品功能分析 0 2009-09-08 12:34 PM
concrete mix= reinfocing for exterior composit deck huangyhg 产品功能分析 0 2009-09-08 12:19 PM
concrete corrosion in partial saturated condition huangyhg 产品功能分析 0 2009-09-08 11:54 AM
chapter 4 preliminary design properties of concrete huangyhg 产品功能分析 0 2009-09-07 11:23 PM


所有的时间均为北京时间。 现在的时间是 12:03 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多