默认 connection design at top of basement wall

connection design at top of basement wall
i have a 9' basement wall, 6' retained soil. zone 3, vertical condition (two story), wind governs with a base shear of 291 plf. i have a 2x6 sill plate connected with 1/2" anchor bolts at 3' o.c. i have floor joist at 12" o.c connected to the rim joist with simpson lpt5 clips at 2' o.c. and simpson a34 clips at each joist to resist the shear. i have design my wall with quikwall for basement wall condition "at rest". the dimension of the stem are 8"x9', the heel is 1'x2', the toe is 2'x10' because i have a soil bearing pressure of 1000psf. the plan checker says i need to add the 60 pcf of soil to the base shear, but the five other engineers in my office say that this is wrong.
what am i missing?
when you say "add the 60 pcf of soil to the base shear" do you mean taking into account seismic force on the retaining wall? or do you mean to design the connections for both the lateral wind shear plus the force along the top of the wall from the retained soil?
it seems that you have developed an independent retaininag wall for your basement. if that is so, then you would not need any base sher at the connection. most basements are not indepenent retaining walls, but rather are braced by the basement slab & 1st floor. perhaps the plan checker does not realize the basement wall is self supporting.
it appears that you designed the wall at rest - which means that it is imparting a load on the diaphragm. if so you must account for it in the diaphragm. how does this shear get out of the diaphragm? if the opposite wall also has soil on it then you have a balanced condition where you actually have compression accross the diaphragm. if the soil is on 3 sides of the house then the load will have to be taken out in shear in the diaphragm. either way i would bump up my diaphragm capacity by 60 plf as the code official is requesting to satisfy their requirements. if you think that's conservative - that's fine. i can't think of a building that fell down because the engineer was conservative.
the footing sizes seem weird!
if you are using ibc the 60 psf loading from the ssoil comes from
table 1610.1 (c) for relatively rigid walls, as when braced by floors, the design lateral soil load shall be increased for sand and gravel type soils to 60 pounds per square foot per foot of depth. basement walls extended not more than 8 feet below grade and supporting flexible floor systems are not considered as being relatively rigid walls.
your 9' height precludes you using the exception.
do your anchor bolts work for transfering load into the floor framing? my experience has been that it is difficult to get 1/2" diameter bolts to work if you are designing the basement walls to span vertically between the footing and the floor diaphragm.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
concrete basement wall design huangyhg 产品功能分析 0 2009-09-08 11:39 AM
cantilever retaining wall or no huangyhg 产品功能分析 0 2009-09-07 10:39 PM
basement walls huangyhg 产品功能分析 0 2009-09-07 02:36 PM
basement wall design huangyhg 产品功能分析 0 2009-09-07 02:35 PM
20 high basement wall and diaphragm huangyhg 产品功能分析 0 2009-09-07 08:23 AM


所有的时间均为北京时间。 现在的时间是 11:18 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多