默认 cold formed steel design

cold formed steel design
i would like to know how different engineers design:
1. stud splice (only for lateral/wind load)
2. base connection design (thicker track or stiffclip if necessary) for cantilever (parapet) studs including the fasteners design (we specify steel network stiffclips under these circustances, however, i am looking for an alternate to stiffclip connection)
attached, please find the sketches.
appreciate your help.
1. i wouldn't splice a stud. you can get them at least 30' long, so why splice?
2. for a lightly loaded cantilever, i use a thick track with power driven fasteners. for a more heavily loaded cantilever, i use a stiffclip, or a conventional steel angle with an expansion anchor.
daveatkins
daveatkins,
i agree with you on item 1. however, this is an example. i just want to see how you do it (calculations please, if possible).
also, in item 2, i would like to see how you show design calculations with tracks and pdfs condition.
i agree no splices without a significant overlap.
in a continious cantilever i put a continuous steel plate nested in the track and bolted to the structure.

i see unsupported parapets like that a lot and think it's a very poor detail. a stiffclip cl will work for some cases with short parapets or low wind loads. but generally your parapet wind load will be much higher than your wall wind load if it is calculated correctly (in the 40psf range). <end rant>
anyway, you could place a "red" steel vertical angle or channel every 4-6 ft with a moment connection to whatever your base material is. then you can just infill your studs normally. the top track spans between vertical posts.
that is why i use a continuous red iron plate the same width as the track. adding a steel channel at 4-6 ft will do the same but will concentrate a larger tension load in your anchor bolt which can be difficult to make work.
1) i agree with all others splices are not recommended. if you have a situation where a splice is needed, you will need to develop the flanges and web not unlike a structural steel member. it will likely require many screws if you choose to use screws. this will obviously be labor intensive. another option would be to install continuous (full height studs) between or adjacent to the studs in question.
2) you will need to create a fixed base. what we have done in the past is install "kicker" braces every so often (3-4 feet on center). then use a top track capable of spanning between the braces. this will eliminate the need for fixity at the base.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
cold formed steel design with ramadvanse huangyhg 产品功能分析 0 2009-09-08 09:54 AM
cold formed steel construction huangyhg 产品功能分析 0 2009-09-08 09:54 AM
buried steel pipe design criteria huangyhg 产品功能分析 0 2009-09-07 05:55 PM
a good manual for cold-formed steel design huangyhg 产品功能分析 0 2009-09-07 09:06 AM
【转帖】asme美国机械工程师标准目录2 huangyhg American standards 5 2009-04-26 02:38 PM


所有的时间均为北京时间。 现在的时间是 08:20 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多