几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-08, 09:44 AM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 coastal engineering, flood proofing a building

coastal engineering, flood proofing a building
can anyone lend any insight into a slab on grade, pre-engineered metal building design. local code calls for a flood water depth of 4' above the finish floor elevation which will create considerable floatation uplift. my client wants to flood protect this new building with exterior walls and flood doors as part of the building design such that he can build on his site with no fill dirt required. any thoughts regarding an economical design? (thick mass concrete floor slab, helical piers, etc?)
thanks.
check out our whitepaper library.
"fema flood mitigation handbook" has a few basic considerations
if you are building in the flood plane, don't you have to provide flood vents and / or break away walls?
yea, that's what i thought.....we had a similar issue on another project and basically had to provide exterior walls that could be knocked over in the event of a surge (i think).
thanks for the suggestions. i guess my real thoughts on this are as follows:
the local code is based on fema publication ep1165-2-314 dec15, 1995.
the local bldg code allows a commercial building finish floor elevation below the design flood water level provided that the building is "flood proofed". the flood proofing will consist of waterproofed exterior walls and flood doors to a height which is 1' of freeboard above the design flood water elevation.
assuming a 50'x50' (2,500 sf) building, with a water height of 5' all around the exterior perimeter, is the total flotation uplift equal to 50x50x5x62.4 = 780 kips?
if so, then the code requires a safety factor of 33% yielding an uplift pressure of 1,037 kips total.
is this correct? if so then resisting this with a mass concrete floor slab is not very economical. (would require a thickness of nearly 3')
thoughts?
fill to a height 1' above the flood elevation is cheaper than the flood proof components envisioned and easier to sell to building officials.
concrete cost: 50*50*3 divided by 27 = 278 yds^3
278 * $100 = $27800
what is the cost of dirt work in your area?
this is a pretty simplified look at the economics.
piers? they can take a lot of uplift is so desinged.
if this is for the coast and the flood zone is from tidal surge, take care in the design. the water may not just come up statically. hence my question about break away walls. waves can create tremenduos loads.
also see fema recommended residential construction for the gulf coast: building on strong and safe foundations:
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
cad and engineering fee spli huangyhg 产品功能分析 0 2009-09-07 06:05 PM
building to bridge engineering huangyhg 产品功能分析 0 2009-09-07 05:43 PM
bridge engineering and building design huangyhg 产品功能分析 0 2009-09-07 05:10 PM
basement in flood zone huangyhg 产品功能分析 0 2009-09-07 02:33 PM
allowable high rise building drif huangyhg 产品功能分析 0 2009-09-07 10:58 AM


所有的时间均为北京时间。 现在的时间是 11:25 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多