cantilever column shifted
hi everyone
i am working on a problem of concrete column ( 12"x12") in a wastewater treatment plant tank. the column is a cantilever type and wooden baffles are installed between the column and the tanks wall inside vertical steel channels attached to the column and the wall . due to lateral forces (most likely) during the water frozen in the tank, the column has been tilted and as a result shifted at the top about 12". the column is about 18' long.
any suggestion of fixing this problem.
sounds like you need a removeable tie at the top of the column to limit the spreading, and some means of controlling the icing - like heat tape?
mike mccann
mmc engineering
i wouldn't fix it. it's just there to support baffles. and they will act very baffle like even with the shift. keep an eye on it over time and see if it gets worse. because fixing it will involve either horsing it back into place or taking it out and building a new column. and i suspect you don't want to do either of those.
jed:
it's going to have to be fixed as i see it, or, when the ice thaws, the baffles will no longer be supported. presently, the ice is literally holdiong the structure together, as well as forcing it apart. the icing must be controlled.
mike mccann
mmc engineering
if it spread apart, you're right, but i thought it might have deflected perpendicular to the baffles.
good point. i guess that i tend to think in one direction. maybe it's a combination...
and the answer is...nador123?
mike mccann
mmc engineering
i was thinking of enlraging the first 4 feet by 6 inches in each direction at the bottom after horsing it back into place. but i still not sure if horsing it back would work and what is the best way to horsing it without causing more damage.
if i read this, the column didnt deflect, but rotated at the base? i would use a raker system to push it back, then perhaps some braces, support perpendicular to the baffles.
i am lost here. a cantilever concrete column implies the base is fixed. if ther is 12" deflection on the top, don't you have problem below?
the only visual damage is spalled concrete all the way at the bottom of the column but there is no major damage along the hieght of the column. the column has been shifted 12" perpendicular to the baffles.
the tank is empty now and no further movement has observed since the top of column shift ( 12") at the begining. but it is deflected at the topwith concrete damage all the way at the bottom.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
cantilever column r determination huangyhg 产品功能分析 0 2009-09-07 10:35 PM
asce 7 cantilever column structural system huangyhg 产品功能分析 0 2009-09-07 12:56 PM
another aci slender column question huangyhg 产品功能分析 0 2009-09-07 12:13 PM
a column at center of tank bottom plate huangyhg 产品功能分析 0 2009-09-07 09:03 AM
4 ply - wood column 9i need help fast110 huangyhg 产品功能分析 0 2009-09-07 08:44 AM


所有的时间均为北京时间。 现在的时间是 08:06 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多