几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-07, 12:01 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 anchorage into concrete pier pier sizing

anchorage into concrete pier / pier sizing
hello everyone,
here is the dilemma. i have a typical building with base shears. the building has steel columns connected with anchor bolts to piers. the piers are reinforced with longituinal reinforcing and has stirrups that ties it all together. i have been trying to determine the anchorage requirements based on aci requiremnts (appendix d).
for example, i have a 10" w section, with say a base shear of 35 kips. what happens when i run through the calculations is that concrete breakout strength is always governing, and it tells me i need like a 4'x4' pier to prevent failure. this is rediculous. all the examples given don't have a typical column to pier connection, and its hard to figure out what is going on.
i think the reason my pier is so big is that there is no consideration of the pier steel reinforcing strength in shear.
does anybody know a good referece example i can follow, or what i am forgetting to consider here. any adivce will help.
steven
check out our whitepaper library.
you come face to face with a dilemma that has engineers scratching their heads viz a viz the aci appendix d anchor bolt shear provisions which in my view is unworkable, overly ponderous, and in need of a major overhaul to bring sanity back into something we all thought we know how to do, but alas, no more.
in my view, use pci design handbook for your anchorage design until appendix d is done in on its own petard.
pumpdady ,
follow the steps given in aisc "design guide-1( second edition).
you always can specify deeper embedment, which is close to development length to increase the capacity of the bolts. in this way you do not have to increase the dimension of the concrete section.
also design guide 7 (industrial structures). you need to figure out how to use reinforcing to take the loads instead of plain concrete-- the aisc design guides give some examples.
i use pier ties, spaced 2" oc, as required at the top of the pier, to resist horizontal load.
daveatkins
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
anchor rod in concrete pier huangyhg 产品功能分析 0 2009-09-07 11:58 AM
anchor for concrete footing huangyhg 产品功能分析 0 2009-09-07 11:56 AM
anchor bolts in reinforced concrete piers huangyhg 产品功能分析 0 2009-09-07 11:52 AM
aci appedix d concrete pryout strength d.6.3 huangyhg 产品功能分析 0 2009-09-07 09:54 AM
28 day vs. 56 day concrete breaks huangyhg 产品功能分析 0 2009-09-07 08:34 AM


所有的时间均为北京时间。 现在的时间是 04:43 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多