几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-07, 12:00 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 anchor shear capacity in double wythe brick

anchor shear capacity in double wythe brick
does anyone know where could i find the allowable shear for anchor bolts embeded in the collared joint at double wythe bricks wall?
aci 530 commentary section 2.1.5.2 states that the shear bond strength of collar joints with mortar could vary from 5 psi to as high as 100 psi. i was trying to find some publications that address the anchor bolt shear breakout strength in this kind of construction.
i would appreciate if you could shed some lights into this matter.

is the shear in the plane of the wall or out of plane? is it a high load? if it isn't a high load, just check it for breakout of the collar joint and neglect the wythes.
it is out of plane and the loading is approx. 400plf. what is the breakout allowable stress for collar joints? thanks in advance.
first, let me make sure i know what a collar joint is. that is the grout placed between two wythes of cmu, correct? if that is correct, just use the shear breakout equations from aci 530 and see if you have enough capacity just in that joint.
400 plf is pretty small. if the load is not reversible, then place the anchors such that the edge distance in the direction of the load is whatever you need it to be to work.
reading your posts, i still don't know how your bolts are oriented. to be in shear and solely within the collar joint, the bolts would either project from the top or end of the wall. in either case, and loaded perpendicular to the wall, i think breakout of the brickwork would be the controlling case.
thank you all for the quick response. the bolts are embeded from the top of wall into the 'space' between the 2 layers of brick, i.e. the collar joint.
the shear is out of plane pushing away from the building.
i am looking at the mortar joint bonding failure, 5 psi per aci 530 2.1.5.2.2. what do you think?
in my discussions with hilti, the brick wall values in the hy-20 are based on failure of the mortar. the problem with the design values is typically the age of the masonry. mortar looses strength over time due to lime leaching out of the joint. quality of old masonry can also be in question. you can't really trust the look of mortar becuase some cheap tuck pointers repair only the last 1/2" and do not fix the entire joint.
the fall back would be to have your anchor mfr come out and pull test the anchors. i swear i don't work them, but our local hilti rep has often offered to come out and pull test. you can use ch 17 of the ibc to determine test requirements.
dougantholz - i concur with you about the age of masonry and the governing mortar strength. this is actually an existing building that i am trying to determine the original designed capacity of the bolts embeded into double wyhte bricks wall from top of walls. i could not find any literature that discuss this design.
the ubc had tables for embedment into masonry - and i believe that goes back about 20+ years. look in the masonry chapters, but of course you need an old ibc.
your most reliable is to test 10% or so of the anchors for 2.5 or 3 x the load in pullout (the way all anchors fail).
applying lateral loading to the top of the wall as you describe would bend the wall perpendicular to the bed joints and also bend one wythe horizontally. i don't think load testing the bolts would prove anything, as the resisting force would negate the bending.
on a slight tangent;
"you can't really trust the look of mortar becuase some cheap tuck pointers repair only the last 1/2" and do not fix the entire joint."
the whole point of repointing is to replace only the external 1/2" or so. this is effective and hopefully affordable. 'fixing' the entire joint would mean rebuilding the wall.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
【转帖】模拟南方软件下polyline线的输入(并进行修改),不敢独享 - 精华帖集合 yang686526 ObjectARX(VB.NET/C#) 0 2009-04-29 05:37 PM
【转帖】在vba里由基本三角函数导出的三角函数 yang686526 数据库ObjectDBX 0 2009-04-28 12:25 PM
在vba里由基本三角函数导出的三角函数 yang686526 ObjectARX(AutoLISP) 0 2009-04-26 06:33 PM
【转帖】怎么判断对象是否被删除 yang686526 ObjectARX(VB.NET/C#) 0 2009-04-21 12:33 PM


所有的时间均为北京时间。 现在的时间是 03:42 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多