几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-16, 10:50 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 wood floors and a 1hour stair wall

wood floors and a 1hour stair wall
ok, i have a wood frame building used for "light" office. i have two stair towers in the corners of the building that require a 1hr interior wall, and a floor that does not need to be rated (i am taking the architects word for this). both the wood frame stairs, and the wood floor will be framing/bearing on the wall. the floors have some decent spans 26' trusses, so the reaction is fairly high for a wood framing.
i typically use cmu or a double wood wall with a gypsum separation wall between. however this building is so small neither are cost effective or practical. i am also not a big fan of trying to get the hanger to bridge over the gap of the 5/8" drywall.
anybody have a detail, or experience in dealing with this?

check out our whitepaper library.
this comment won't help much with the framing, but please be aware that when some rated wood walls are fire rated, the load used during the test could have been below the allowable load of the wall. meaning, when the rated wall assembly was tested, it could have been loaded to a certain amount, not to the full structural capacity of the wall. therefore, you need to make certain that your stud stresses remain below this particular value to ensure that the wall retains its true rated value.
i have been trying to find a good source of information for you to reference, but in the mean time you should begin with finding out which rated assembly your architect intends to use and try to look up specific information regarding that specific assembly.
it is likely that your floors must be rated, particularly if there is separation between floors that divides tenants or occupancies.
for the firewall joist support, you essentially have two choices:
1. use hang-over joist hangers with reduced load capacity for the drywall gap.
2. use fire-retardant treated plywood over the joists and butt the gypsum to the plywood, sealing the joint with fire rated foam or putty.
thanks, both helpful comments. i do have in my hand a simpson hanger capacity hanging over 5/8" gyp.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭



所有的时间均为北京时间。 现在的时间是 08:02 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多