默认 removal of transfer girder

removal of transfer girder
i have two transfer girders that i must remove that support a single concentrated load of 1,000k. i have developed two schemes but i am having difficulty developing a method on how to preload my new structure to minimize deflection as load is transfered over. with such high loads and being on the third floor of a high rise, is there equipment available/speciality contractors that can actually perform the work?
does anyone know of a speciality contractor with this type of equipment?
check out our whitepaper library.
call a few heavy machinery movers in your area.
mgardina,
i think hydraulics are the best way to handle your situation. provide temporary support (tower/braced framing + steel beams) immediately adjacent to the existing transfer girders (those that will be removed) such that the existing 1,000 kips load can be transferred to this temporary support system. by using calibrated hyd jacks (underneath the temp beams/on top of the tower framing) and a hyd manifold with pump, it is possible to de-load the transfer beams, reinstall new permanent support, then de-load the temporary supports, hence loading the new permanent support. this can happen in a very controlled way, with measurements of load and displacement. it is somehwat specialised, but it was been done before.
i would contact a concrete post-tensioning company in your area. they are involved with hydrailucs and often do "heavy lifting" and specialized jacking, including syncronized jacking and preloading.
hth
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
precast prestressed u beam bridge huangyhg 产品功能分析 0 2009-09-15 02:24 PM
post tensioned transfer girder huangyhg 产品功能分析 0 2009-09-15 01:48 PM
designing a transfer beam huangyhg 产品功能分析 0 2009-09-08 06:10 PM
crane girder overstressed huangyhg 产品功能分析 0 2009-09-08 02:33 PM
beam to girder analysis huangyhg 产品功能分析 0 2009-09-07 03:08 PM


所有的时间均为北京时间。 现在的时间是 12:34 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多