几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-15, 03:11 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 prying action

prying action
i have a situation where i have a typical beam that rests on top of a steel tube column. the column has a 1" plate and connects to the beam by 4 bolts (the old typical connection). i have a significant uplift on this connection. about 33 kips worth. i'm well aware the of the effects of the prying on the bolts. is there any way i can avoid prying by increasing stiffness and lowering deformation? if so, how can this be determined? also, do these bolts need to be pretensionsed or is snug tight sufficient? it will not be cyclic loading. thanks for your help.
find a job or post a job opening
wale- if this is a new conn that hasn't been fabricated yet, you can eliminate prying forces by adjusting the top plate thickness. solve for "tc" per formula on aisc ninth ed page 4-90, setting b=(uplift tension force per bolt)=33k/4. also, imho snug tight bolts are sufficient. regards
in this case where the uplift appears to be coming from the beam which i assume is bolted through the flanges to the column cap plate, it is actually the beam flanges that are the controlling elements for prying action. putting half-depth stiffeners on the lower half of the beam at the connection (web and flange welded) would most likely eliminate the prying action concern by stiffening the lower flanges against deforming.
thanks for the help. that's exactly what i needed.
willisv: i have full height stiffeners in the connection for what you just stated and for some other things i have going on. thanks again.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
prying action in welded connections huangyhg 产品功能分析 0 2009-09-15 03:10 PM
prying action and moment connections huangyhg 产品功能分析 0 2009-09-15 03:10 PM
base plate prying action huangyhg 产品功能分析 0 2009-09-07 02:27 PM


所有的时间均为北京时间。 现在的时间是 03:59 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多